
21
i.) After putting the saw carriage on the rails, push the saw carriage ahead to see if it runs
smoothly on the rails, adjust the height of the support feet if needed otherwise tighten all
bolts. Check rail joint, it is important that both sections are in line with each other and that the
rails are straight.
Содержание 21-SV500B
Страница 1: ...Read this manual carefully before using the product Translated from the original 21 SV500B SAWMILL...
Страница 12: ...12 Table of contents...
Страница 13: ...13 Table of contents 6 Mount the pawl 57 as shown below and mount the tension spring 57 1 2 3 4...
Страница 32: ...32 Table of contents BLUEPRINT I CARRIAGE...
Страница 33: ...33 Table of contents BLUEPRINT II SQUARE PROFILE BLUEPRINT III THE CARRIAGE FEET...
Страница 34: ...34 Table of contents BLUEPRINT V BAND WHEELS BLUEPRINT VI RAILS...