manualshive.com logo in svg
background image

POWER RACK ASSEMBLY INSTRUCTIONS

05

ASSEMBLY

BEFORE YOU BEGIN

IMPORTANT:

• 

Ensure the floor is a solid, level, structurally-sound surface.

•  Clear around and above the assembly area of any obstructions.
•  Check location meets the Training Space criteria (see Training Space section, page 4).
• 

Insert Platform or Olympic Lifting Insert Platform configurations: Assemble platform first as the Power Rack will be 

assembled and mounted onto the platform.

EQUIPMENT ANCHORING

The standard Power Rack assembly configuration may be anchored directly onto concrete flooring at the four anchor points 
(see Figure 3; anchor bolts not supplied). All other assembly configurations (Insert Platform and Olympic Lifting Insert Platform) 

requires the Power Rack to be bolted onto the platform (hardware supplied by Keiser Corp.).

All Anchors Fasteners:

•  Use only anchors that are suitable for equipment height 

and weight.

•  Minimum concrete thickness: 5 in (127 mm).
• 

Anchors must reach minimum embedment as specified 

by the manufacturer to ensure design values are kept.

•  Do not reuse anchors as they are designed for one-time 

use only.

• 

Covered floors (wood, carpet, rubber, etc.) — cut out the 
floor mount plate pattern to mount equipment directly 

onto concrete. Ensure equipment makes full contact with 

the concrete floor; no gaps.

•  It is the responsibility of the facility owner to adhere to 

building codes and ordinances. 

All Keiser Racks are designed for stability when used as intended.

Professional  installation  is  required  by  qualified  personnel.  Read  through  these  instructions  carefully  before  assembling  the 

equipment. Heed all warnings and safety information presented in this Assembly Instruction. 

Do not skip, substitute, or modify 

any assembly procedure or steps. Doing so could result in serious injury. Product failure due to improper installation is not covered 
under warranty.

TOOLS AND MATERIALS REQUIRED

25 ft-lbs

(34 Nm)

9/16-inch Combination 

Ratcheting Wrench

1/2-inch Combination 

Ratcheting Wrench

Ratchet Wrench, Extension

with 9/16-inch Socket

Safety Blade

Driver with Phillips Bit

(Required for closed crate only)

Cutting Pliers

Safety Glasses

Figure 3. Anchor Points of the Power Rack

Hole diameter: 

0.50 in / 13 mm

IMPORTANT:

 Avoid the use of a power drill/driver for driving bolts during assembly to prevent damaging equipment.

OK, so then 9/16" combo ratcheting wrench and 9/16 socket wrench, plus 1/2" socket wrench.

3/16-inch

Allen Wrench

Lint-free cloth

9/16-inch Torque Wrench 

(Open-End or Crowfoot attachment)

Содержание 3110 Series

Страница 1: ...sregardingthe AssemblyInstructions after reading this guide contact Keiser Customer Support 1 559 256 8000 service keiser com keiser com support Keiser the Keiser logo and other trademarks associated...

Страница 2: ...service keiser com keiser com support After assembly please record the serial number in the space provided below Extra lines provided for multiple units Serial Nos RECORD YOUR SERIAL NUMBER REGISTER...

Страница 3: ...injury 12 KeiserCorporationisnotresponsiblefordamageorserious injury caused by incorrect installation assembly or use 13 Use of the Power Rack or any purpose not explicitly specified by the manufactur...

Страница 4: ...e sides 48 inches 1 219 mm for the front and 12 inches 305 mm for the rear see Figure 2 Power Racks arranged side by side may share the Free Space TRAINING SPACE NOTE Optional Accessories Dip Bar Stat...

Страница 5: ...time use only Covered floors wood carpet rubber etc cut out the floor mount plate pattern to mount equipment directly onto concrete Ensure equipment makes full contact with the concrete floor no gaps...

Страница 6: ...with Cable Tray Bar Catch Set Spotting Bars 1 1 2 NOTE OptionalOlympicLiftingInsertandInsertPlatforms includingoptionalaccessories notshown Checkforanydamageormissing parts Ifpartsaredamagedormissing...

Страница 7: ...crate materials or hardware until assembly is successfully completed UNPACKING Position the shipping crate in a cleared area Open crate to expose the equipment as shown in Figure 5 Remove all parts f...

Страница 8: ...ts help is required to safely and successfully complete the assembly procedure HEAVY OBJECT Help is required during lifting to avoid muscle strain or back injury RIGHT LEFT REAR FRONT x4 Anchor Points...

Страница 9: ...Pedal as you begin to position the Power Module on the Base Plate Release the Foot Pedal before the Actuator Tab enters the Power Module pull the wire and air lines through the Bottom Frame Position...

Страница 10: ...ION WIRES Connect the Air Lines and Communication Wires Push in Fittings Method of Assembly 1 Check that the end tube is cut square and is free from burrs 2 Push the tube through the release ring butt...

Страница 11: ...y Tabs push any excess lines back into the Bottom Frames Tilt a Power Module with Bottom Frame for clearance to position and install the Bench Positioner B 4 POWER DISPLAY CONNECTION CHECK AND BENCH P...

Страница 12: ...NOTE There is no Communication Wire connection at the Left Rear Post RIGHT REAR POST with COMM WIRE IMPORTANT Clicksound confirmsproperconnection RIGHT REAR POST BOTTOM FRAME LEFT REAR POST RIGHT POW...

Страница 13: ...lay by momentarily pressing both and Foot Pedals RESISTANCE window change from OFF to CLEr 0 proper connection B Communication Wire IMPORTANT Clicksound confirmsproperconnection Power Display enters s...

Страница 14: ...UCTIONS 14 7 SET FRONT POSTS Short end facing Power Module Decals face inward RIGHT FRONT POST LEFT FRONT POST IMPORTANT DO NOT TIGHTEN BOLTS UNTIL FINAL INSTALLATION PARTS MUST BE ABLE TO ADJUST FOR...

Страница 15: ...NT CROSS BRACE Suspension Trainer Hook face inward IMPORTANT BEFORE INSTALLATION CHECK BOLTS AT THE BASE OF THE POSTS ARE NOT FULLY TIGHTENED TO ALLOW FOR EASY BOLT HOLE ALIGNMENT IMPORTANT DO NOT TIG...

Страница 16: ...NT BEFORE INSTALLATION CHECK BOLTS AT ALL POST CONNECTION POINTS ARE NOT FULLY TIGHTENED TO ALLOW FOR EASY BOLT HOLE ALIGNMENT IMPORTANT DO NOT TIGHTEN BOLTS TO ALLOW FOR EASY BOLT HOLE ALIGNMENT IMPO...

Страница 17: ...POWER RACK ASSEMBLY INSTRUCTIONS 17 10 INSTALL WEIGHT STACK IMPORTANT BEFORE INSTALLATION CHECK BOLTS AT ALL POST CONNECTION POINTS ARE NOT FULLY TIGHTENED TO ALLOW FOR EASY BOLT HOLE ALIGNMENT...

Страница 18: ...rbell Attachments Bar Catch Spotting Bar Left side shown Set the right side components to corresponding position setting NOTE eChip Extension Strap and Weight Stack Decal sets are packaged in a kit at...

Страница 19: ...com support search Air Compressor manuals 1 Make sure the Power Rack has been installed according to the instructions and check all bolts are properly tightened and torqued to specification see items...

Страница 20: ...egardingtheAssemblyInstructions after reading this guide contact Keiser Customer Support 315502_A KEISER CORPORATION 2470 S Cherry Ave Fresno CA 93706 1 559 256 8000 service keiser com keiser com supp...

Отзывы: