![KEHUA TECH iStoragE1 Series Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/kehua-tech/istorage1-series/istorage1-series_user-manual_3911453021.webp)
Hybrid Inverter
User Manual
2 Overview
13
NO.
Mark
Illustration
Remarks
②
DRM
Inverter demand response modes.
\
③
BMS
Connect to COM port of battery to
communicate with battery.
\
④
Parall1/Parall2
Have parallel function.
Reserved
⑤
WIFI/4G
It is used for WIFI/4G
communication.
\
⑥
BATT.
+
DC input terminal
It is used to connect with
battery.
-
⑦
Grounding port
External grounding port.
⑧
GRID
AC output terminal
It is used to connect with grid.
⑨
BACKUP
AC output terminal
It is used to connect with load.
⑩
PV1/PV2
+
DC input terminal
It is used to connect with PV.
-
⑪
DC switch
DC switch
Can be removed under specific
market requirements.
DC switch
DC switch (as shown in the
⑪
of Figure2-2) is the connection switch between inverter and PV array.
During installation and wiring, the DC switch must be OFF.
Before maintenance, the DC switch must be OFF, and 5 minutes after the indicator is off, the
maintenance can be done.
When maintenance or wiring, the DC switch must be disconnected.
Содержание iStoragE1 Series
Страница 1: ...i iStoragE1 Series Hybrid inverter User Manual...
Страница 2: ......
Страница 108: ......