ECLIPSE – INSTALLATION/OPERATION MANUAL
Eclipse
Jan-10
18
SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
FOR MOST RECENT UPDATES PLEASE VISIT www.KerrEnergySystems.com.
The following form
MUST
be completed for the warranty to be valid.
Installed by:
Address:
Telephone:
Date:
START UP TEST RESULTS
Nozzle:
Pressure:
Air:
Turbulator:
CO
2
:
Smoke Number:
Breech
Draft:
Stack
Temperature:
Test Performed By:
Staple Printout Here:
Staple Smoke Spot Here: