16
INITIAL SETUP INSTRUCTIONS, continued
STEP 12
–
Test the setup.
A.
Place a new seal on an empty vial and
set the vial on the Vial Holder so that it is
up against the Vial Stop (A).
B.
Pull the Crimp Lever (B) forward as far
as it will go, then gently allow the
Crimp Lever to return to its original
position.
C.
Remove the vial from the Vial Holder
and inspect the seal.
If the crimp is not acceptable, then
both the Pressure and Height Settings
must be adjusted by repeating the
Initial Setup Instructions beginning
with Step 4.
If the crimp is acceptable but slightly
more down pressure is desired, then
loosen both Height Lock Handles, turn
the Height Adjustment Dial
counterclockwise by no more than 5
fine increments, retighten both Height
Lock Handles, and repeat Steps 12A
through 12C.
If the crimp is acceptable, the
BenchMark
is now ready for operation. Follow the Operating
Instructions in this manual.
A
B
WARNING:
If there is too much down pressure, there is a chance of vial breakage during
the crimp cycle. Wear impact resistant safety glasses and protective gloves.