b
Note
Before commissioning is performed it has to be ensured that all available
additional modules have been scanned!
Operating instructions
multicomp
Version 4.00
Page 29 of 62
ED
EBD
A
013
4
/ 36
09
-1
GB
The
Commissioning
submenu contains the following items:
1. Transformer settings (current, induced current, voltage)
a. Series transformer
i.
Primary current
ii.
Secondary current
iii.
Phase allocation
b. Induced current transformer
i.
Activate, monophase or three-phase
ii.
Primary current cabinet 1
iii.
Secondary current cabinet 1
iv.
Continue with cabinets 2 to 6
c. Voltage transformer
i.
Primary voltage
ii.
Secondary voltage
iii.
Phase allocation
2. cos
ϕ
- Settings
a. Target cos
φ
for power consumption
b. Target cos
φ
for power recovery
c. Alarm cos
φ
for FTS message (facility too small)
3. Stages - Settings
a. Auto configuration mode
b. Stage parameter
i.
Stage power
ii.
Cabinet No.
iii.
Discharge time
iv.
Detuning / reactor factor
v.
Operating cycles
vi.
Overtemperature switch-offs
vii.
Facility type
viii.
Special outputs fans / alarm relays
c. Nominal value (rated voltage Ph-Ph, power frequency)
The
Settings
submenu contains the following items:
1.
Communication / Display
2.
System
3.
Service
The
Messages
submenu contains the following items:
1.
Active error messages
2.
Error state
3.
Allocation for message
a. Alarm relay
b. Stage switch-off