installation manual
2
● There is combustible gas or materials.
● There is much evaporating acid or alkaline gas.
● Other special areas.
● Notes Before Installation
Select the correct carry-in path.
● Move this unit as originally packaged as possible.
● If the air conditioner is installed on a metal part of the building, it
must be electrically insulated according to the relevant standards
to electrical appliances.
● Avoid installing it in a narrow space which has a high requirement
to noise.
The following are selectable accessories
Remark per EMC Directive 89/336/EEC
For to prevent flicker impressions during the start of the
compressor (technical process), following installation
conditions apply.
●
The power connection for the air conditioner has to be done at
the main power distribution. The distribution has to be of a low
impedance, normally the required impedance reaches at a
●
32A fusing point.
●
No other equipment has to be connected with this power line.
For detailed installation acceptance, please refer to your
contract with the power supplier if restrictions do apply for
products like washing machines, air conditioners or
●
electrical ovens.
●
For power details of the air conditioner, refer to the rating plate
of the product.
3.
ACCESSORIES
Table.3-1
Cautions on remote controller installation
●
Never throw or beat the controller.
●
Before installation, operate the remote controller to determine
its location in a reception range.
●
Keep the remote controller at least 1m apart from the nearest
TV set or stereo equipment. (It is necessary to prevent
image disturbances or noise interferences.)
●
Do not install the remote controller in a place exposed to direct
sunlight or close to a heating source, such as a stove. Note
that the positive and negative poles are in right positions when
loading batteries.
4.
INDOOR UNIT INSTALLATION
Installing Φ10 Hanging Screw Bolts (4 Bolts)
Please refer to the following figure for the distance
measurement between the screw bolts.
Please install with screw bolts.
The handling to the ceiling varies from the constructions, consult
the construction personnel’s for the specific procedures.
●
The size of the ceiling to be handled
.
Do keep the ceiling flat.
Consolidate the roof beam for possible vibration.
●
Cut off the roof beam.
●
Strengthen the place cut off, and consolidate the roof beam.
Carry out the pipe and line operation in the ceiling after
finishing the installation of the main body. While choosing where
to start the operation, determine the direction of the pipes to be
drawn out. Especially in case there is a ceiling, position the
refrigerant pipes, drain pipes, indoor & outdoor lines to the connec-
tion places before hanging up the machine.
The installation of hanging screw bolts.
NOTE
Fig.3-1
Remote controller & Its Frame
1. Remote controller .................................... 1
2. Remote controller holder. ........................ 1
3. Mounting screw
(ST2.9x10-C-H) ........................................ 2
4. Alkaline dry battery(AM4)
...... .................. ..........................................2
Name of
Accessories
Q‘ty
Outline
Usage
Installation manual
1
(This manual)
Pipe insula-
tion material
7.1-16kw
2
Heat insulation
20-28kw
4
Water outlet joint
7.1-16kw
1
For drainage
Clasp
1
Chucking the joint which
connect the drain hose
and the outlet of indoor
unit
Water connec-
ting pipe
20-28kw
2
To connect drain pipe
Adhesive tape
for seal
2
To connect drain pipe
Network
matching wire
7.1-16kw
1
The indoor unit which at
the terminal of
communication system
should connect a
impedance between port
P and port Q
20-28kw
2
Copper nut
7.1-16kw
1
Use for pipe connection
of engineering installation
20-28kw
2
Electric throttle
connect part A
20-28kw
1
Connect electric throttle
part A
Electric throttle
connect part B
20-28kw
1
Connect electric throttle
part B
Spring
20-28kw
1
To fix display box
Содержание KPDHF-71 DN3.0
Страница 2: ...MD14I 041FW DZ2 16100101A01132...
Страница 28: ......