When the final OFN charge is used, the system shall be vented down to atmospheric pressure 
to enable work to take place. This operation is absolutely vital if brazing operations on the 
pipe-work are to take place.

 

Ensure that the outlet for the vacuum pump is not closed to any ignition sources and there 
is ventilation available.

 

16.

 

Charging procedures 

In addition to conventional charging procedures, the following requirements shall be followed:

 

 

Ensure that contamination of different refrigerants does not occur when using charging 
equipment. Hoses or lines shall be as short as possible to minimize the amount of 
refrigerant contained in them.

 

 

Cylinders shall be kept upright.

 

 

Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.

 

 

Label the system when charging is complete (if not already).

 

 

Extreme care shall be taken not to overfill the refrigeration system.

 

 

Prior to recharging the system, it shall be pressure tested with OFN. The system shall be 
leak tested on completion of charging but prior to commissioning. A follow up leak test 
shall be carried out prior to leaving the site.

 

 

17.

 

Decommissioning 

Before carrying out this procedure, it is essential that the technician is completely familiar 
with the equipment and all its detail. It is recommended good practice that all refrigerants 
are recovered safely. Prior to the task being carried out, an oil and refrigerant sample shall 
be taken.

 

 

In case analysis is required prior to re-use of reclaimed refrigerant. It is essential that 
electrical power is available before the task is commenced.

 

a)

 

Become familiar with the equipment and its operation.

 

b)

 

Isolate system electrically

 

c)

 

Before attempting the procedure ensure that:

 

 

mechanical handling equipment is available, if required, for handling refrigerant cylinders;

 

 

all personal protective equipment is available and being used correctly;

 

 

the recovery process is supervised always by a competent person;

 

 

recovery equipment and cylinders conform to the appropriate standards.

 

d)

 

Pump down refrigerant system, if possible.

 

e)

 

If a vacuum is not possible, make a manifold so that refrigerant can be removed from 

various parts of the system.

 

f)

 

Make sure that cylinder is situated on the scales before recovery takes place.

 

g)

 

Start the recovery machine and operate in accordance with manufacturer s instructions.

 

h)

 

Do not overfill cylinders. (No more than 80% volume liquid charge).

 

i)

 

Do not exceed the maximum working pressure of the cylinder, even temporarily.

 

j)

 

When the cylinders have been filled correctly and the process completed, make sure that 

the cylinders and the equipment are removed from site promptly and all isolation valves 
on the equipment are closed off.

 

k)

 

Recovered refrigerant shall not be charged into another refrigeration system unless it has 

been cleaned and checked.

 

 
 

 

 

In

fo

rmat

io

n

 

Se
rvi
ci

n

g

 

Содержание KCIS-52 DR11

Страница 1: ...KCIS 125 DN10 KUE 125 DVN10 KCIS 125 DN10 KUE 125 DTN10 KCIS 140 DR11 KUE 140 DTR11 KUE 140 DVN10 KCIS 140 DR11 KUE 140 DTN10 KCIS 160 DR11 KUE 160 DTN10 KUE 160 DTR11 IMPORTANT NOTE Read this manual...

Страница 2: ...nstallationOverview 08 Indoor UnitInstallation 09 Indoor Unit Parts 09 Indoor Unit Installation Instructions 10 Outdoor Unit Installation 13 Outdoor Unit Installation Instructions 13 Drain Joint Insta...

Страница 3: ...Outdoor Unit Wiring 23 Indoor Unit Wiring 24 Power Specifications 25 Air Evacuation 27 Evacuation Instructions 27 Note on Adding Refrigerant 28 Caution Risk of fire for R32 refrigerant only Panel Ins...

Страница 4: ...els 1 Outlet pipe clasp some models 1 Drain joint some models 1 Seal ring some models 1 Installation Accessory some models Ceiling hook 4 Suspension bolt 4 Orifice tube some units 1 EMC Magnetic Ring...

Страница 5: ...0mA and disconnection must be incorporated in the fixed wiring in accordance with the wiring rules Before you install the unit consider strong winds typhoons and earthquakes that might affect your uni...

Страница 6: ...ion are required for the units adopt R32 Refrigerant The appliance shall be stored in a room without continuously operating ignition sources forexample openflames an operating gas appliance oran opera...

Страница 7: ...ON CAUTION This symbol shows that information is available such as the operating manual or installation manual Note about Fluorinated Gasses 1 This air conditioning unit contains fluorinated gasses Fo...

Страница 8: ...he outdoor unit Page 12 Install the drainpipe Page 15 Evacuate the refrigerationsystem Page 25 Install the front panel Page 27 Connect thewires Page 22 Perform a test run Page 29 Connect the refrigera...

Страница 9: ...t of more than 2 5m 8 above the floor DO NOT install the indoor unit in a bathroom or laundry room as excessive moisture can short the unit and corrode the wiring CAUTION Install the indoor and outdoo...

Страница 10: ...all There is enough room for installation and maintenance There is enough room for the connecting pipe and drainpipe The ceiling is horizontal and its structure can sustain the weight of the indoor un...

Страница 11: ...e Fig 4 3 CAUTION The unit body should align perfectly with the hole Ensure that the unitand the hole are the same size before moving on 2 Drill 4 holes 5cm 2 deep at the ceiling hook positions in the...

Страница 12: ...ceiling Follow theinstructions abovefortheremainderofthe installation Main body Ceiling board Fig 4 6 M6 x 12 Bolts Fig 4 8 Installation template NOTE Ensurethattheindoorunitislevel The unit is equip...

Страница 13: ...h room to install the connecting pipes and cables and to access them for maintenance Strong wind is exposed to direct sunlight If possible make sure the unit is located far away from your neighbors pr...

Страница 14: ...6 633 25 600 23 6 48 710 28 759 29 8 710 28 60 710 28 843 33 710 28 Outdoor Unit Installation Outdoor Unit Dimensions Mounting Dimensions W x H x D Distance A Distance B 760x590x285 29 9x23 2x11 2 530...

Страница 15: ...nd outdoor units 1 Determine the location of the wall hole based on the location of the outdoor unit 2 Using a 65 mm 2 5 core drill drill a hole in the wall NOTE When drilling the wall hole make Drain...

Страница 16: ...ig 6 2 1 1 5m 39 59 Downwardslope 1 100 0 53cm 20 8 10cm 4 Fig 6 4 Drainpipe Installation NOTE Whenconnectingmultipledrainpipes install the pipes as shown in Fig 6 4 39 59 Drainpipe Installation NOTE...

Страница 17: ...rocess Wall Outdoor Indoor Fig 6 5 4 Pass the drain hose through the wall hole Make sure the water drains to a safe location where it will not cause water damage or a slipping hazard NOTE Whendrilling...

Страница 18: ...nd outdoor units meets the following requirements Outdoor unit Outdoor X Fig 7 2 L1 L H2 The line branch pipe L2 Indoor unit H1 Indoor unit Fig 7 1 Refrigerant PipingConnection The drop height between...

Страница 19: ...he rising gas piping can prevent this An oil trap should be installed every 10m 32 8ft of vertical suction line riser See Fig 7 3 CAUTION If the outdoor unit is installed higher than the indoor unit I...

Страница 20: ...perfect 90 angle Refer to Fig 7 5 for examples of bad cuts Fig 7 6 Step 3 Flare pipe ends Proper flaring is essential to achieve an airtight seal 1 After removing burrs from cut pipe seal the ends wi...

Страница 21: ...0 4 0 8 15 9 45 47 N m 459 480 kgf cm 19 2 0 76 19 7 0 78 Fig 7 9 19 1 65 67 N m 663 683 kgf cm 23 2 0 91 23 7 0 93 22 75 85N m 765 867 kgf cm 26 4 1 04 26 9 1 06 8 Remove the flaring tool and flare f...

Страница 22: ...door unit 8 Insulate all the piping including the valves of the outdoor unit 9 Open the stop valves of the outdoor unit to start the flow of the refrigerant between the indoor and outdoor unit CAUTION...

Страница 23: ...he cable for connection a You must first choose the right cable size before preparing it for connection Be sure to use H07RN F cables Table 8 1 Minimum Cross Sectional Area of Power and Signal Cables...

Страница 24: ...gnal cable through the wireoutlet Control box Wire outlet Fig 8 3 4 Connecttheu lugstotheterminals Match the wire colors labels with the labels on the terminal block and firmly screw the u lug of each...

Страница 25: ...ODEL Btu h 36K 37K 60K 36K 37K 60K POWER PHASE 3 Phase 3 Phase 3 Phase 3 Phase VOLT 380 420V 380 420V 208 240V 208 240V CIRCUIT BREAKER FUSE A 25 20 32 25 32 25 45 35 Outdoor Power Supply Specificatio...

Страница 26: ...se 3 Phase VOLT 380 420V 380 420V 208 240V 208 240V CIRCUIT BREAKER FUSE A 25 20 32 25 32 25 45 35 Inverter Type A C Power Specifications MODEL Btu h 18K 19K 24K 25K 36K 37K 48K 49K 60K POWER indoor P...

Страница 27: ...the valve by turning the wrench in a 1 4 counterclockwise turn Listen for gas to exit the system then close the valve after 5 seconds Flare nut Cap Compound gauge 76cmHg Pressuregauge Valve body Valv...

Страница 28: ...0 32oZ m ft Total pipe length standard pipe length x65g 0 69oZ m ft R32 Total pipe length standard pipe length x 12g 0 13oZ m ft Total pipe length standard pipe length x 24g 0 26oZ m ft Total pipe le...

Страница 29: ...o the arrowed direction shown in Fig 10 3 so that the ceiling opening is completely covered Latch Piping side Drain side Fig 10 1 Step 2 Remove the installation covers at the four corners by sliding t...

Страница 30: ...body 5 Close the front grille 6 Fasten the installation covers at all four corners by pushing them inwards See Fig 10 6 Fig 10 6 Fig 10 5 Water condensation Fig 10 7 Loosen upper nut Fig 10 8 Adjust...

Страница 31: ...perature is being registered correctly d Ensure the indicators on the remote control and the display panel on the indoor unit work properly e Ensure the manual buttons on the indoor unit works properl...

Страница 32: ...the following options Dispose of the appliance at designated municipal electronic waste collection facility When buying a new appliance the retailer will take back the old appliance free of charge Th...

Страница 33: ...thority to ensure the power network meet above requirement To be incompliance withEN61000 3 11 the product MCDT4 48CRN1 QC5W shall be connected only to a supply of the system impedance Zsys 0 264 K or...

Страница 34: ...re extinguisher adjacent to the charging area 6 No ignition sources No person carrying out work in relation to a refrigeration system which involves exposing any pipe work that contains or has contain...

Страница 35: ...t capacitors are discharged this shall be done in a safe manner to avoid possibility of sparking that there no live electrical components and wiring are exposed while charging recovering or purging th...

Страница 36: ...pment shall be set at a percentage of the LFL of the refrigerant and shall be calibrated to the refrigerant employed and the appropriate percentage of gas 25 maximum is confirmed Leak detection fluids...

Страница 37: ...l refrigerants are recovered safely Prior to the task being carried out an oil and refrigerant sample shall be taken In case analysis is required prior to re use of reclaimed refrigerant It is essenti...

Страница 38: ...order has been properly maintained and that any associated electrical components are sealed to prevent ignition in the event of a refrigerant release Consult manufacturer if in doubt The recovered ref...

Страница 39: ...39 QSQ4 001I D 16122700000122 20171108 The design and specifications are subject to change without prior notice for product improvement Consult with the sales agency or manufacturer for details...

Страница 40: ......

Отзывы: