Assembly instructions Everest
®
engine Base Camp 4140
5 First use
|
5.3 Installation
Connect the compressed air service unit
CAUTION
Damage as a result of incorrect fitting
Damage may occur if it is not fitted correctly
▶ Fit the maintenance unit of the compressed air line vertically.
▶ Connect compressed air line ① to supply available in the building.
See also: "Technical data" in the instructions for use
▶ Set air pressure on the manometer of the maintenance unit ② to 5.5 bar.
5.3.3 Adapt the voltage
▶ Ensure that the nominal voltage and nominal frequency of the milling/grinding
unit corresponds to the nominal voltage and nominal frequency of the building
wiring.
B
A
Z
Y
X
x4
x1
x8
+130V
+24V
M
3~
120
230
100
T10H 250V
T6,3L 250V
T3,15L 250V
T6,3L 250V
▶ Disconnect the power entry module ① from the power supply and pull out the
fuse drawer ③ from the power entry module.
▶ Remove the fuse holder ② from the fuse drawer and turn it so that the required
voltage value appears in the inspection window.
14/51
Содержание Everest engine Base Camp 4140
Страница 1: ...Assembly instructions Everest engine Base Camp 4140 Always be on the safe side...
Страница 54: ......
Страница 55: ...1 005 8728 kb 20080311 06 en...