- 147 -
16. Crane operation when the outriggers are used
(541A-0171-0E)
(1) Preparations for crane operation
Before starting crane operation, always follow the procedure below to change the machine's position from driving
condition to a position suitable for crane operation.
Always follow the specified procedure and precautions strictly to set the machine in its working
configuration before you start crane operation.
Crane operation with the crane in an incorrect position could cause severe accidents.
(541A-0172-0E)
Содержание SR-300L
Страница 2: ...SR 300L 214521 11 5 mm...
Страница 6: ...4 MEMO...
Страница 10: ...8 MEMO...
Страница 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Страница 15: ...2 MEMO...
Страница 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Страница 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Страница 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Страница 29: ...16 MEMO...
Страница 67: ...54 MEMO...
Страница 74: ...60 MEMO...
Страница 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Страница 169: ...153 ON OFF...
Страница 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Страница 216: ...199...
Страница 217: ...200...
Страница 218: ...201...
Страница 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Страница 225: ...208...
Страница 226: ...209...
Страница 227: ...210...
Страница 233: ......