- 127 -
WARNING
13-3 Precautions after operation
(0099-0171-1E)
(1) Stow the boom (jib) away after you have finished work
Leaving the crane in its working position can inadvertently
cause accidents. At the end of work, stow the boom (jib) and
lock it.
(2) Park in a safe, level location
Choose a level surface in which to park.
(3) If there is no alternative to parking on an incline, place chocks
against the tires so that the crane cannot move.
(4) If there is no alternative to parking on a road, take appropriate
safety measures
If you park the crane on a public road, place warning signs so
that the crane can be clearly distinguished from other vehicles.
Particularly
at
night
you
should place lights and signs for night
use.
Observe the safety regulations and laws of the country where
the crane is used.
Содержание SR-300L
Страница 2: ...SR 300L 214521 11 5 mm...
Страница 6: ...4 MEMO...
Страница 10: ...8 MEMO...
Страница 14: ...1 1 Part names and terms 541A 0019 0E 1 1 Part names 541A 0020 0E 1 1 1 Exterior 541A 0268 0E...
Страница 15: ...2 MEMO...
Страница 17: ...4 For details of this page Refer to pages 33 36 2 Outside the cab...
Страница 19: ...6 For details of this page Refer to pages 92 and 93 2 Outside the cab...
Страница 21: ...8 For details of this page Refer to page 146 2 Outside the cab...
Страница 29: ...16 MEMO...
Страница 67: ...54 MEMO...
Страница 74: ...60 MEMO...
Страница 152: ...136 14 3 4 Crane performance tracks when using outriggers 541A 0293 0E...
Страница 169: ...153 ON OFF...
Страница 215: ...198 20 1 2 Points for pre drive checks 511A 0076 0E...
Страница 216: ...199...
Страница 217: ...200...
Страница 218: ...201...
Страница 224: ...207 20 2 2 Points for preoperational checks 511A 0079 0E...
Страница 225: ...208...
Страница 226: ...209...
Страница 227: ...210...
Страница 233: ......