Universal Dock or Piling Mount
Assembly & Installation Instructions
1. Dock Mount Base (1)
2. Clam Shell Pipe Clamp (1; set of 2 pieces)
3. 1/2”-13 x 1 1/4” Hex Head Bolt (5)
4. 1/2”-13 Nut (5)
5. 1/2” Flat Washer (2)
6. 9 Hole Plate (1)
7. 4 Hole Angle Bracket (1)
8. Dock Mount Strap (2)
9. 5/16” Flat Washer (2)
10. 5/16” Nut (2)
11. 5/16”-18 x 1 1/2” Hex Head Bolt (2)
12. 1/2” Lock Washer (3)
PARTS INCLUDED
TOOLS & SUPPLIES NEEDED
•
1” NPT or BSPT (European) Threaded Galva-
nized or Stainless Steel Pipe up to 10’ long (1)
•
Lag Screws or Bolts for Mounting to Dock (8)
•
3/4” Wrench
•
1/2” Wrench or 1/2” Socket with Ratchet
•
3/4” Socket with Ratchet
Assembly Instructions
Note:
Customer must provide the 1” galvanized or
stainless steel threaded pipe extension not more than
10 feet in length. Since applications may vary, the
user will supply the appropriate lag screws or bolts to
secure the dock or piling base. Kasco urges that the
base be mounted as securely as possible.
For salt
water use, Kasco suggests that you use 1” stainless
steel pipe.
STEP ONE:
Determine the most suitable application for your
situation. Install the Dock Mount Base to your dock
or piling using 8 mounting lag screws or bolts sup-
plied by user. For mounting on dock surface or the
horizontal surface make one end of the Dock Mount
Base flush with the dock edge as shown. For piling or
other vertical surface mount large end down as
shown.
STEP TWO:
Wrap one of the Dock Mount Straps around the De-
icer can. Insert one 5/16 – 18 x 1 ½” Hex Head Bolt
through the 9 Hole Plate and then through the two
holes in the strap. Use a 5/16” Washer and 5/16” Nut
to hold the strap onto the can. Position the band as
close to the De-Icer cage as possible and tighten us-
ing the 1/2” Wrench or Socket. Do not over tighten.
STEP THREE:
Attach the 2
nd
draw strap to
the Deicer can following the
same procedure as step 2 us-
ing the lower hole on the 9
hole plate.
2400D (1/2HP) Band
Placement
3400D & 4400D (3/4 &
1HP) Band Placement