STEP FOURTEEN
Hardwire the 240V/208V, 4 wire service into the C-
85 control panel per the Instructions on page 14 of
this manual. The aerating fountain can either be
plugged into the 240V outlet on the right hand side of
the C-85 panel or hardwired into the panel.
PLUG:
Insert the plug on the unit into the outlet and
securely close the outlet cover until it snaps into
place.
Test the GFCB with the test button now and
every 30 days.
HARDWIRE:
The bottom of the C-85 control panel
has several knock-outs for hardwiring the unit. Re-
move a knock-out that is not used for the main power
as well as the internal metal barrier plate in the panel.
Remove the plug from the power cord on the unit and
strip back 12” of cord jacket to expose the wires (2
hot and 1 ground). With the main power discon-
nected, connect the bare wire (stripped) portion of the
GREEN ground wire to the grounding strip (GND) at
the bottom of the panel and secure tightly. Locate
and remove the plastic shield under the yellow timer
(black or clear depending on model). Under shield,
lug #2 and #4 are LOAD lugs. Loosen the screws
and insert the bare wire (stripped) portion of the
WHITE wire into #2 and the bare wire (stripped) por-
tion of the BLACK wire into #4. Tighten both lugs
securely. Replace metal barrier plate in panel.
Test the GFCB with the test button now and every
30 days.
If lights are installed, they can now be in-
stalled per Instructions included with the lights.
Once completed, power can be restored to the panel.
ENJOY YOUR NEW KASCO AERATING
FOUNTAIN!
8
For ease of removal, you may choose to keep at least
one anchor within reach from shore, just below the
water’s surface.
STEP ELEVEN
(ALTERNATE INSTALLATION)
In ponds where the water level fluctuates signifi-
cantly, you may need to suspend a small weight (12”
of 1” galvanize pipe works well) at the mid-point of
the rope to take up any slack as the water level drops.
The weight should be light enough so the Fountain
can rise as the water level rises. This can also help
hide ropes by sinking them further below the surface.
STEP TWELVE
Install the C-85 control panel on the post with the
power supply. Use the #10 x 1” long or longer
screws and the screw placements on the control panel
to secure the panel to the post.
NOTE:
The control
panel must be hung upright in order to be waterproof.
STEP THIRTEEN
Set Timer in the control panel to desired ON and OFF
times per the Instructions on page 14.