English
5.906-590.0 Rev. 01 (05/17)
51
1 Plate
2 Casing
3 Suction hose
4 Holes
Installation information
Place the plate into the second groove of the suction
hose.
The drilled hole in the plate and the drilled hole in the
casing must be on the same side.
1 Hose
2 Screws
3 Casing
4 Housing top
Fit the casing top onto the casing.
Bolt casing together.
NOTE
Perform a function test.
Operation of the yellow knob casing top.
1 Screws
2 Casing
3 Hand wheel
Unscrew the screws.
Remove the housing.
Remove the handwheel.
AFDG Uninstall / install steam nozzle in the front