28
English
5.906-508.0 Rev. 00 (11/10)
Preliminary tasks:
Î
Remove operating panel.
Î
Remove the wastewater reservoir.
1 Suction turbine plate
2 Fastening screw
3 High pressure/low pressure solenoid valve
Î
Unscrew the fastening screws of the suction tur-
bine plate.
Î
Raise the suction turbine plate.
1 Fastening nut
2 Suction turbine
3 Suction turbine plate
Î
Remove the fastening nuts of the suction turbine.
Î
Disconnect all the connecting cables of the suction
turbine.
Î
Remove the suction turbine.
1 Fastening nut of the protective conductor
2 Connecting block
3 Fastening screw
Î
Unscrew the fastening screws of the terminal strip.
Î
Remove the terminal block.
Î
Unscrew the protective conductor from the suction
turbine plate.
Î
Remove all the cable ties.
1 High pressure/low pressure solenoid valve
2 Fastening screw
Î
Unscrew the fastening screws of the high pres-
sure/low pressure solenoid valve.
Î
Remove the high pressure/low pressure solenoid
valve.
Installation in reverse order
Note
After the assembly, check all hoses for leaks.
5.5
Suction turbine
5.5.1 Removing the suction turbine plate