English
5.906-508.0 Rev. 00 (11/10)
27
Preliminary tasks:
Î
Remove operating panel.
Î
Remove the wastewater reservoir.
Î
Remove suction turbine plate.
1 Connection plug
2 EMC filter
3 Suction turbine plate
Î
Remove the connector plug on the EMC filter.
Î
Unscrew the protective conductor.
Installation in reverse order
Note
After the assembly, check all hoses for leaks.
5.4.2 Replacing the mains cable