EIASMANUAL 0918
KAM CONTROLS, INC.
6
I N S TA L L AT I O N C O N T I N U E D
5.
6.
Measure the distance (D1) from the top of the main pipe to the end of the connection where the E-IAS™ Sampler
is going to be installed. Fig. 3-5.
D1
D1
FIG. 3-5
Pull Shaft back until the Probe is all the way within the Seal Housing and tighten the Hex Socket Cap Screws on
the Locking Collar. This will prevent the E-IAS™ Sampler Shaft from sliding and the Probe will be protected inside
the Seal Housing until and during installation. Fig. 3-4.
Calculate the insertion distance using the following formula:
TID
–
Total Insertion Distance
D1
–
Distance from the top of the valve to the pipe
WT
–
Pipe Wall Thickness
TD
–
Threaded Depth
ID
–
Inside Diameter
For Flanged Seal Housing
Total Insertion Distance (TID)= D1 + WT + (Pipe ID x 7/16) + Seal Thickness
Example:
D1= 14"
WT=
.25"
ID = 8.125"
Seal
Thickness=1/8"
TID=14 + .25 + (8.125 x 7/16) + 1/8
14 + .25 + 3.55 + .125=17.93
7.