
Maintenance
9 --- 42
9.11
Topping off the oil
The oil level indicator (9) of machines in operation should be checked weekly. The machine
should be topped off with oil as soon as the minimum level (1) (border of green and red) is
reached.
The machine may only be operated when the oil level indicator is in the
green zone.
lo
w
hi
g
h
lo
w
hi
g
h
lo
w
hi
g
h
1
2
3
1 Lowest oil level
2 Optimum oil level
3 Highest oil level
Remove cover panel (3, siee chapter 9.2).
Check the oil level when the compressor is running.
Stop the compressor package under full load (see chapter 8.4).
Lock the main disconnect in the ”off” position in accordance with ap-
plicable lock out/tag out procedures (example: OSHA CFR 29
§ 1910.147) to ensure the compressor does not restart.
Before opening or removing pressurized components (pipes, hoses,
tanks, etc.) it is imperative that the compressor package is completely
depressurized.
Venting the compressor package (see chapter 9.9).
Attention!
Содержание CSD 75
Страница 2: ......
Страница 11: ...Technical Specification 1 6...
Страница 19: ...Construction and Operation 5 14...
Страница 20: ...Construction and Operation 5 15...
Страница 58: ...Appendix 11 53 11 Appendix 11 1 Wiring Diagram...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ...Appendix 11 72 11 2 Maintenance Schedule Model No Serial No Date Description of work Operating hours Signature...