
Construction and Operation
5 --- 16
5.5
DUAL Control
p
max
p
min
Full load
Standstill
Mo
to
r
p
o
w
e
r
P
re
ssu
re
Time
t1
t2
1
2 3
4
5
Idle
In DUAL Control (combined idle and start ---stop) the compressor normally runs at full --
load, idle or standstill.
The controller regulates the compressor package between full -- load and idle.
If the compressor package runs in idle for longer than the preset period (1) to (2), for
example t
1
= 6 min, the drive motor is stopped completely (2). When the lower switching
point p
min
(3) is reached the compressor package is automatically started again. Pressure
rises to the upper switching point p
max
(4), and the compressor package switches to idle. If
the pressure falls again to, for example, p
min
(5) within a shorter period (4) to (5), then the
compressor is automatically switched from idle to full---load.
Содержание CSD 75
Страница 2: ......
Страница 11: ...Technical Specification 1 6...
Страница 19: ...Construction and Operation 5 14...
Страница 20: ...Construction and Operation 5 15...
Страница 58: ...Appendix 11 53 11 Appendix 11 1 Wiring Diagram...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ...Appendix 11 72 11 2 Maintenance Schedule Model No Serial No Date Description of work Operating hours Signature...