
Initial Start
7 --- 24
7.3
Checklist
Is the floor at the place of installation solid and level?
yes
no
Is the space large enough for the compressor package or its components?
yes
no
Are inlet and exhaust air apertures available in sufficient size and number?
yes
no
Are all components of the compressor package easily accessible?
yes
no
Is the power supply cable of sufficient cross ---section?
(have electrical connection carried out by qualified electrician or company familiar with
local conditions)
yes
no
Is a shut off valve fitted by the user?
yes
no
Is a flexible connecting hose or axial compensator fitted between the compressor
package and the compressed air system?
yes
no
Have all screws, bolts and electrical connections been checked for tightness?
yes
no
Has the oil level in the oil separator been checked?
yes
no
Is a main disconnect switch fitted (suited to the motor starting characteristics)?
yes
no
Has the setting of the drive motor overload current trip been checked?
yes
no
Have you ensured that there are no other air components located in the exhaust air flow
of the compressor package?
yes
no
Have service personnel been instructed on safety regulations?
yes
no
Содержание CSD 75
Страница 2: ......
Страница 11: ...Technical Specification 1 6...
Страница 19: ...Construction and Operation 5 14...
Страница 20: ...Construction and Operation 5 15...
Страница 58: ...Appendix 11 53 11 Appendix 11 1 Wiring Diagram...
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ...Appendix 11 72 11 2 Maintenance Schedule Model No Serial No Date Description of work Operating hours Signature...