Section 3 - 13
K
e
y
C
u
tti
n
g
&
P
in
n
in
g
Rekeying Conventional Cylinders
Pry off and discard the spring cover. Rekey and apply a new spring cover. Since all Peaks products are
designed to be top loaded, use of a follower for rekeying is optional.
Mortise / rim cylinder screws have a Loctite
®
coating. If cams or plug retainers are removed, use new
screws and tighten them firmly.
Pinning Conventional Cylinders
Pin to uniform pin stack height
Insert a key into the core and turn the plug 90 degrees. Extend the control lug into the locked position.
Top load the core. Let the bottom pins stop against the plug as shown in figure 1.
All the stacks should have a uniform height. Dump any incorrect chamber and repin it. When the pin
stack heights are uniform, turn the plug and let the pins drop into the plug.
5800 series capped small format interchangeable cores
Global cores come in .140" spacing only.
Place the core loaded with pins only, into the capping block.
Insert a tumbler spring, 3800-00-4010, into each chamber by
dropping them into the holes in the block.
One chamber at a time, place a cap on top of each spring
and tap it in place with the capping tool and a plastic or
rawhide mallet until the capping tool is flush against the block.
Do not use excessive force
.
Lubricate discs with Superlube™
synthetic grease.
For 140 cores, a capping press in .140" spacing is available from Kaba.
Rekeying
Place the ejector tool into the hole under the chamber(s) and drive out the pins,
spring, and cap with a light tap.
Discard the elements and repin. Always use new springs and caps.
1. Load pins
with plug turned.
3840-00-3540
140 capping block
(6 holes)
3800-00-3547
capping tool
is used with
both blocks
3800-00-3548
ejector tool
3. Errors in 4th and 5th chambers
Incorrect
2. Uniform pin stack heights
Correct
Pinning Interchangeable Cores
• Work on a firm bench surface.
• Strike tools gently with a plastic or rawhide mallet.
• Do not use a metal hammer.
Содержание 5140 Series
Страница 1: ...Technical Manual ...
Страница 5: ...Technical Manual Section 1 Introduction ...
Страница 11: ...Technical Manual Section 2 Product Information ...
Страница 38: ...Section 2 27 Product Information Peaks Global Notes ...
Страница 39: ...Technical Manual Section 3 Key Cutting and Pinning ...
Страница 62: ...Section 3 23 Key Cutting Pinning Peaks Global Notes ...
Страница 63: ...Technical Manual Section 4 Key Control Record Keeping ...
Страница 73: ...Technical Manual Section 5 Cylinder Installation Guide ...
Страница 84: ...Section 5 11 Cylinder Installation Guide Peaks Global Notes ...
Страница 85: ...Section 5 12 Cylinder Installation Guide Peaks Global Notes ...