Https://www.bueno-electric.com
BUENO ELECTRIC
BUENO ELECTRIC
BUENO ELECTRIC
BUENO ELECTRIC
Contact: [email protected]
Fax: +86-25-51816989
35
During AC test, protection is put out of service, so as to do the channel precision tests in
heavy current.
Select the sub-menu “AC test” under the menu “system test”, systems asks for the secret
cods.
AC test
Input secret code: 00
AC test
Secret code error!
Re-input secret code: 00
Secret codes check window News block for the error secret
codes
When the secret codes are correctly entered, the system indicates that the menu “AC test” has
been entered. The MMI renews the channel RMS values and phase angles every 3 seconds .
AC test
Ia 0.013 A -153.7º
Ib 0.010 A -164.5º
Ic 0.014 A -168.6º
Use “
∧
” or “
∨
” key to turn the lines “+” or “
-
” key to turn the pages.
2.2.7.4 Integrated automation function
Integrated automation function
Protection upstream transmission Telemetering upstream transmission
Alarm upstream transmission Code list printing
Telesignalling upstream transmission
2.2.7.4.1 Protection upstream transmission
Enter “protection upstream transmission” and enter the secret codes, a picture is shown.
Protection upstream transmission
Name current zone I ±
Press ENTER key to transmit , press Q
to withdraw
Wait for transmission
Press
【
←┘
】
key, the operating information of protection zone I is sent to the monitoring and
telecontrol background