Description of servicing and maintenance operations
6.1
Prepare the truck for the servicing and maintenance operations
All required safety measures must be taken to prevent any accidents in the course of
the servicing and maintenance operations. The following preparatory operations
must be performed:
– Park and lock the truck securely (see chapter E).
– Unplug the battery connector, thus securing the industrial truck against accidental
operation.
– When work has to be performed under the jacked-up industrial truck, suitable
measures must be taken to prevent any dropping, tilting or slipping of the truck.
f
When lifting the industrial truck, the instructions contained in chapter “Transportation
and commissioning” have to be observed (refer to chapter C).
6.2
Secure the load-carrying unit
The load-carrying unit can be secured in
elevated position.
– Lift the load-carrying unit until the
inner mast (1) is positioned above the
beam of the load-carrying unit safety
device.
– Screw out fastening screw (4) and
remove safety bolt (3) from beam (2)
at main mast (5).
– Attach safety bolt to the vertical hole of
the beam and screw on tightly.
– Lower the driver position carrier slowly
as far until the inner mast is seated on
the safety bolt.
6.3
Cleaning the lifting chains
m
It is important to keep all lifting chains
and pivots clean and lubricated at all
times. Lifting chains are safety
elements.
Chains must not be excessively dirty.
For cleaning, only paraffin derivatives
(such as, for example, kerosene or
diesel fuel) may be used.
Never clean chains with steam jet
pressure washer, cold cleaner, or
chemical cleaners.
1
2
3
4
5
1
2
4
501
1
838
6 GB
F 10
6
Description of servicing and maintenance operations
6.1
Prepare the truck for the servicing and maintenance operations
All required safety measures must be taken to prevent any accidents in the course of
the servicing and maintenance operations. The following preparatory operations
must be performed:
– Park and lock the truck securely (see chapter E).
– Unplug the battery connector, thus securing the industrial truck against accidental
operation.
– When work has to be performed under the jacked-up industrial truck, suitable
measures must be taken to prevent any dropping, tilting or slipping of the truck.
f
When lifting the industrial truck, the instructions contained in chapter “Transportation
and commissioning” have to be observed (refer to chapter C).
6.2
Secure the load-carrying unit
The load-carrying unit can be secured in
elevated position.
– Lift the load-carrying unit until the
inner mast (1) is positioned above the
beam of the load-carrying unit safety
device.
– Screw out fastening screw (4) and
remove safety bolt (3) from beam (2)
at main mast (5).
– Attach safety bolt to the vertical hole of
the beam and screw on tightly.
– Lower the driver position carrier slowly
as far until the inner mast is seated on
the safety bolt.
6.3
Cleaning the lifting chains
m
It is important to keep all lifting chains
and pivots clean and lubricated at all
times. Lifting chains are safety
elements.
Chains must not be excessively dirty.
For cleaning, only paraffin derivatives
(such as, for example, kerosene or
diesel fuel) may be used.
Never clean chains with steam jet
pressure washer, cold cleaner, or
chemical cleaners.
1
2
3
4
5
1
2
4
Содержание ETX ac 125
Страница 1: ...Operating instructions 50118386 ETX ac 125 150 G 01 01 05 03...
Страница 3: ...0108 GB...
Страница 7: ...50118386 GB I 4...
Страница 9: ...A 2 50118386 GB...
Страница 11: ...B 2 50118386 GB 2 Description of assembly groups and functions 1 2 3 4 5 6 7 9 10 11 12 8 17 16 15 14 13...
Страница 16: ...B 7 50118386 GB...
Страница 21: ...B 12 50118386 GB...
Страница 25: ...C 4 50118386 GB...
Страница 44: ...E 15 50118386 GB Display symbol assignment...
Страница 45: ...50118386 GB E 16 Display symbol assignment Time of day Height display Operating hours...
Страница 73: ...50118386 GB E 44...
Страница 81: ...50118386 GB F 8 g Glide surfaces s Lubricator nipples...