0
709
.GB
F 8
6
Maintenance and Repairs
6.1
Preparing the truck for maintenance and repairs
All necessary safety measures must be taken to avoid accidents when carrying out
maintenance and repairs. The following preparations must be made:
– Parking the truck securely
(see Chapter E).
Z
Opening the battery panel
(see chapter D).
– Disconnect the battery (1) to prevent
the truck from accidentally starting.
– When working under a raised lift truck,
secure it to prevent it from lowering,
tipping or sliding away.
F
When raising the truck also refer to the
instructions in the “Transport and Commissioning” section (see Chapter C).
6.2
Opening the battery panel
(see chapter D).
6.3
Opening the front panel
Trucks with folding operator platform:
– Fold down the operator platform (5).
General:
– Unlock the panel latches (2) using a
spanner (width 8).
– Remove the screws (3).
– Lift off the panel (4) and place it next to
the truck.
When the work is finished, closed the
panel (4).
1
1
2
3
4
5
1
2
1
2
0
709
.GB
F 8
6
Maintenance and Repairs
6.1
Preparing the truck for maintenance and repairs
All necessary safety measures must be taken to avoid accidents when carrying out
maintenance and repairs. The following preparations must be made:
– Parking the truck securely
(see Chapter E).
Z
Opening the battery panel
(see chapter D).
– Disconnect the battery (1) to prevent
the truck from accidentally starting.
– When working under a raised lift truck,
secure it to prevent it from lowering,
tipping or sliding away.
F
When raising the truck also refer to the
instructions in the “Transport and Commissioning” section (see Chapter C).
6.2
Opening the battery panel
(see chapter D).
6.3
Opening the front panel
Trucks with folding operator platform:
– Fold down the operator platform (5).
General:
– Unlock the panel latches (2) using a
spanner (width 8).
– Remove the screws (3).
– Lift off the panel (4) and place it next to
the truck.
When the work is finished, closed the
panel (4).
1
1
2
3
4
5
1
2
1
2
Содержание ERE 120n
Страница 1: ...Operating instructions G Operating instructions 51159400 ERE 07 09 11 13 ERE 120n ...
Страница 3: ...0108 GB ...
Страница 7: ...0506 GB 2 ...
Страница 9: ...0505 D A 2 ...
Страница 14: ...B 5 0709 GB Dimensions sheet with fixed platform ...
Страница 19: ...0709 GB B 10 ...
Страница 29: ...0709 GB D 6 ...
Страница 32: ...E 3 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Страница 34: ...E 5 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Страница 38: ...E 9 1113 GB 4 1 5 13 B B B F R V 0 3 2 R V ...
Страница 57: ...1113 GB E 28 ...
Страница 59: ...1113 GB E 30 ...