Battery removal and installation
5.1
Changing the battery from the top (
t
)
F
The truck must be level. To prevent short circuits, batteries with exposed terminals or
connectors must be covered with a rubber mat. Place the battery connector or the
battery cable in such a way that they will not get caught on the truck when the battery
is removed.
Z
When transporting batteries using a crane, ensure that the crane is of adequate
capacity (the battery weight is indicated on the battery data plate on the battery
container). The crane lifting gear must exert a vertical pull. The hooks of the lifting
gear must never fall into the battery cells.
– Expose the battery (see Section 3).
– Remove the battery connector (3).
– Undo the screw (6) of the battery retainer and remove the battery retainer (7).
– Strap the crane lifting gear to the eyes (8).
– Pull the battery up out of the container.
M
Installation is the reverse order. When reinstalling the battery, note the proper
installation position and make sure the battery is connected correctly.
– After installing the battery again, check all cables and plug connections for visible
signs of damage.
F
Close the battery panel carefully and slowly.
Do not reach between the battery panel and the chassis.
7
8
6
0
709
.GB
D 4
5
Battery removal and installation
5.1
Changing the battery from the top (
t
)
F
The truck must be level. To prevent short circuits, batteries with exposed terminals or
connectors must be covered with a rubber mat. Place the battery connector or the
battery cable in such a way that they will not get caught on the truck when the battery
is removed.
Z
When transporting batteries using a crane, ensure that the crane is of adequate
capacity (the battery weight is indicated on the battery data plate on the battery
container). The crane lifting gear must exert a vertical pull. The hooks of the lifting
gear must never fall into the battery cells.
– Expose the battery (see Section 3).
– Remove the battery connector (3).
– Undo the screw (6) of the battery retainer and remove the battery retainer (7).
– Strap the crane lifting gear to the eyes (8).
– Pull the battery up out of the container.
M
Installation is the reverse order. When reinstalling the battery, note the proper
installation position and make sure the battery is connected correctly.
– After installing the battery again, check all cables and plug connections for visible
signs of damage.
F
Close the battery panel carefully and slowly.
Do not reach between the battery panel and the chassis.
7
8
6
Содержание ERE 120n
Страница 1: ...Operating instructions G Operating instructions 51159400 ERE 07 09 11 13 ERE 120n ...
Страница 3: ...0108 GB ...
Страница 7: ...0506 GB 2 ...
Страница 9: ...0505 D A 2 ...
Страница 14: ...B 5 0709 GB Dimensions sheet with fixed platform ...
Страница 19: ...0709 GB B 10 ...
Страница 29: ...0709 GB D 6 ...
Страница 32: ...E 3 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Страница 34: ...E 5 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Страница 38: ...E 9 1113 GB 4 1 5 13 B B B F R V 0 3 2 R V ...
Страница 57: ...1113 GB E 28 ...
Страница 59: ...1113 GB E 30 ...