C Transport and Commissioning
1
Lifting by crane
F
Only use lifting gear with sufficient
capacity (for truck weight see truck
data plate, chapter B).
Z
Lifting gear attachment points (1) are
provided on the chassis and the fork in
case the truck is to be lifted or trans-
ported by crane.
– Park the truck securely (see
Chapter E).
– Secure the lifting gear to the
attachment points (1).
M
The lifting gear must be attached to the
attachment points in such a manner
that it cannot slip under any circum-
stances and cannot come into contact
with any attachments of the truck when
the truck is lifted.
2
Commissioning
M
Only operate the truck with battery current. Rectified AC current will damage the
electronic components. The battery leads (tow cable) must be less than 6m long.
To prepare the truck after delivery or after transport, proceed as follows:
– Check the truck for completeness and satisfactory condition of the equipment.
– Install battery (where required). Do not damage battery cable.
– Charge the battery (see Chapter D).
– If necessary, adjust the combination instrument to match the battery type (see
Chapter D).
1
1
1
C 1
0
108
.GB
C Transport and Commissioning
1
Lifting by crane
F
Only use lifting gear with sufficient
capacity (for truck weight see truck
data plate, chapter B).
Z
Lifting gear attachment points (1) are
provided on the chassis and the fork in
case the truck is to be lifted or trans-
ported by crane.
– Park the truck securely (see
Chapter E).
– Secure the lifting gear to the
attachment points (1).
M
The lifting gear must be attached to the
attachment points in such a manner
that it cannot slip under any circum-
stances and cannot come into contact
with any attachments of the truck when
the truck is lifted.
2
Commissioning
M
Only operate the truck with battery current. Rectified AC current will damage the
electronic components. The battery leads (tow cable) must be less than 6m long.
To prepare the truck after delivery or after transport, proceed as follows:
– Check the truck for completeness and satisfactory condition of the equipment.
– Install battery (where required). Do not damage battery cable.
– Charge the battery (see Chapter D).
– If necessary, adjust the combination instrument to match the battery type (see
Chapter D).
1
1
1
Содержание ERE 120n
Страница 1: ...Operating instructions G Operating instructions 51159400 ERE 07 09 11 13 ERE 120n ...
Страница 3: ...0108 GB ...
Страница 7: ...0506 GB 2 ...
Страница 9: ...0505 D A 2 ...
Страница 14: ...B 5 0709 GB Dimensions sheet with fixed platform ...
Страница 19: ...0709 GB B 10 ...
Страница 29: ...0709 GB D 6 ...
Страница 32: ...E 3 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Страница 34: ...E 5 1113 GB 14 15 5 9 10 11 12 3 4 13 2 1 R V 8 8 7 7 6 ...
Страница 38: ...E 9 1113 GB 4 1 5 13 B B B F R V 0 3 2 R V ...
Страница 57: ...1113 GB E 28 ...
Страница 59: ...1113 GB E 30 ...