12 | Introduction
III.2 Communication Matrix
This paragraph contains a table and description, which components exchange information via Ethernet network.
In this table each component name is shown in the vertical row with an Alphabetic character to identify. This character is
also used horizontally.
Station Computer
A
B
C
D
E
F
G
H
I
DP1
MPC1
A
-
13b
23a
1b
2b
3b
4b
5b
6b
21a
DP2
MPC2
B
13a
-
23b
1b
2b
3b
4b
5b
6b
21b
JS
MPC3
C
24a
24b
-
1d
2d
3d
4d
5d
6d
THR
XP-T1
D
1a
1a
1c
-
XP-T2
E
2a
2a
2c
-
XP-T3
F
3a
3a
3c
-
XP-T4
G
4a
4a
4c
-
XP-T5
H
5a
5a
5c
-
XP-T6
I
6a
6a
6c
-
III.2.1 DP Control Commands to Thrusters 1a, 2a, 3a, 4a, 5a, 6a
The MPC’s run the DP controllers which give thruster Set Points for RPM/Pitch and direction angle to the thruster
controller processors. Only the DP station that is in control sends these Set Points.
III.2.2 Thruster Feedback to DP Controllers 1b, 2b, 3b, 4b, 5b, 6b
The thruster processors collect actual RPM/Pitch signal and send this back to DP controllers.
III.2.3 JC Control Commands to Thrusters 1c, 2c, 3c, 4c, 5c, 6c
The MPC runs the JC controller, which give thruster Set Points for RPM/Pitch and direction angle to the thruster
controller processors. Only if the JC station is in control it sends these Set Points.
III.2.4 Thruster Feedback to JC Controllers 1d, 2d, 3d, 4d, 5d, 6d
The thruster processors collect actual RPM/Pitch signal and send this back to JC controller.
III.2.5 Settings Synchronize Between DP Stations 13a, 13b
The DP stations exchange user settings continuously. User settings include Gain, Alarm Limits, Set Points and all other
settings used to control the vessel.
III.2.6 Status DP Stations to Back-Up DP Station 21a, 21b
The DP stations exchange their status continuously.
III.2.7 Status DP Stations JC Station 23a, 23b
The DP stations exchange their status continuously.
III.2.8 Status JC Station DP Stations 24a, 24b
The DP stations exchange their status continuously.
Содержание Alphatron Marine AlphaDynaPos
Страница 1: ...AlphaDynaPos Ship Automation and Navigation system Operation Manual www jrc am ...
Страница 5: ...5 Contents 4 2 Appendix B Checklist for Taking DP system into Operation 85 ...
Страница 13: ...13 Introduction III 3 System Overview DP2 Figure 2 system Overview DP2 ...
Страница 14: ...14 Introduction III 4 Sensor Overview Figure 3 Sensor Overview ...