5
INSTALLATION INSTRUCTIONS
5. Slide the coil on to the valve shaft and replace
the top nut. Tighten the top nut (max. torque
1Nm) using a 14 mm wrench.
The coil can be rotated 360° around the valve,
you can align the coil as desired.
6. Place the flat gasket over the coil
connection pins.
Make sure there is no debris between the
gasket and the coil.
7. Mount the timer on to the coil as illustrated
below.
8. Remove the protection cap from the
connector and connect your power cable
to the connector
as shown below.
9. Place the connector gasket on the connector,
plug the connector on the timer as illustrated
below and tighten the screw (max. torque 1Nm)
and make sure both gaskets are secured
properly to ensure IP65 rating.
10. After double checking that the power
supply corresponds with the voltage specified
on the coil, you can switch it on.
N
L
Содержание TEC-11
Страница 9: ...9 SERVICE CHART Date Description Name...