background image

16

JO

NIX

duct

BLUE

RED

NUMBER 

OF FLASH 

DESCRIPTION

1

Necessity of periodic.

2

Active ionisation.

Necessity of sostitution 

of generators.

3

error equipement (blocked ionisation until the 

next reboot) - SHORT-CIRCUIT 

(removed power supply to the processor)

Possible presence of short-circuit in 

one or more generators.

4

Possible lack/breakup of 

one or more generators.

It exists a relay that allows to activate or disactivate the ionisation through Modbus protocol.
There is a serial line RS485 with Modbus protocol (4800N81) for the programming of the main 
parameters and the remote diagnosis of the equipement.

The alarms are split up into type and marked through 2 clean contact usually opened: 
1.  RL1 Maintenance alarm periodic/replacement.

  It is enabled after 7000 hours of functioning to indicate the necessity of a periodic cleaning 

of plasma generators (flashing way 5 sec on, 2 sec off) or after 14000 hours to ask the 
sostitution of generators themselves (fixed way)..Once done the requested operations the 
relay can be reset through command on serial line or through IN1 entrance. In this last one 
case you have to apply a short-circuit of 2 seconds. 

Two leds, one red and one blue, in the electronic card inside the module provide indications of the 
type of the active alarm.

The registers with variables are the following:

VARIABLE DEFINITION

UNITY

NOTES

TYPE

0

Firmware code

-

-

Lecture

1

Firmware version

-

-

Lecture

2

Modbus destination

-

-

Lecture / Scripture

3

Selected configuration

-

0: 2 short size generators
1: 2 long size generators
2: 4 short size generators
3: 4 long size generators
5: threshold defined by Modbus register 19

Lecture

4

-

-

-

-

5

-

-

-

-

6

Current generators voltage

cV

-

Lecture

Содержание duct 70MIC2C

Страница 1: ...MADE IN ITALY JONIX duct JONIX duct 70MIC4F JONIX duct 70MIC2F JONIX duct 70MIC4C JONIX duct 70MIC2C DUCTABLE IONISING MODULE USE AND MAINTENANCE MANUAL...

Страница 2: ...IX S p A reserves every right concerning this manual including the right to make any necessary change or improvement to its products and to the manual at any time and without notice It is forbidden to...

Страница 3: ...10 5 4 STORAGE 10 5 5 HANDLING DEVICE IN OPERATING CONDITIONS 10 6 INSTALLATION AND COMMISSIONING 11 6 1 SAFETY STANDARDS 11 6 2 GETTING STARTED 12 6 3 CHOOSING THE INSTALLATION SITE 12 6 4 INSTALLIN...

Страница 4: ...ct damage caused by incorrect installation or damage caused by the units installed by inexperienced and or unauthorised staff At the time of purchase check that the device is intact and complete The M...

Страница 5: ...orbidden to use the device in environments where the air is mixed with and or altered by other gaseous compounds and or solid particles Using the device for purposes other than those intended and that...

Страница 6: ...ny that sold you the device 2 WARNINGS AND GENERAL PROHIBITIONS HAZARD It refers to dangerous situations that may result from the use of the device in order to ensure personal safety WARNING It refers...

Страница 7: ...the device Please note that the use of products that require electricity involves the observance of some crucial safety rules such as When installing commissioning and operating this product it is ma...

Страница 8: ...of JONIX duct are High efficiency reduction of bioburden and of volatile organic compounds up to 99 compared to the initial concentration Low power consumption from 20 to 40 VA Strong deodorizing act...

Страница 9: ...arious models can be assembled in group of the same type or comined according to the airflow to deal with Mod Article Dimensions LxPxH mm Power Supply Plasma generators Max sprayed airflow m3 h Max po...

Страница 10: ...by filling in the relevant section on the delivery note and specifying the type of damage 5 3 INSPECTION UPON RECEPTION The Manufacturer disclaims any liability for damage due to incorrect unloading f...

Страница 11: ...egrity of the various components and of the electrical mains to which it is connected making sure that it is fitted with a circuit breaker upstream of the power line as shown in this manual Never inse...

Страница 12: ...ontained in this manual Never force the components when assembling although it is made with high strength materials the parts of the device can be damaged if handled incorrectly Do not try to perform...

Страница 13: ...ductwork and with any material JONIX duct devices thanks to their adaptability and to their space saving designs can be easily fixed on either side of the duct All you need is an opening on a wall in...

Страница 14: ...TENTION BEFORE STARTING ANY OPERATION MAKE SURE THAT THE MAIN POWER SUPPLY IS DISCONNECTED The JONIX duct device leaves the factory fully wired It only needs to be plugged into the electric mains 230V...

Страница 15: ...end you to link the contact of input signal and serial interface RS485 JONIX duct devices are made up of electronic control enclosed in an insulating shell and of actuators the ionising unity are expo...

Страница 16: ...is enabled after 7000 hours of functioning to indicate the necessity of a periodic cleaning of plasma generators flashing way 5 sec on 2 sec off or after 14000 hours to ask the sostitution of generat...

Страница 17: ...abled 1 enabled Lecture Scripture 18 Pilotage Modbus On Off 0 not active ionisation 1 active ionisation Lecture Scripture 19 Manual threshold for MAX voltage alarm generators cV Lecture Scripture 20 T...

Страница 18: ...unt of maintenance consisting in regularly cleaning the glass and outside mesh of the condenser The device signals the need for maintenance of the generators by means of a special alarm contact every...

Страница 19: ...sh Fig 06 Pull off the outer mesh from the tube if you have not already done so in the previous point Clean the glass using a damp cloth If the operation is difficult to perform pull slightly the eart...

Страница 20: ...nsure a minimum distance of at least 3 mm from the base of the tube Fig 09 Gently screw the ionising tube holding on to the base green part If the operation is difficult to perform pull slightly the e...

Страница 21: ...the appropiate sockets of the JONIX duct module Switch on the moduleby turning the On Off switch to I Verify the functioning of the device it has to be hear a light sizzle coming from the tubes Reset...

Страница 22: ...s of operation 7 3 SPECIAL MAINTENANCE 7 2 1 Replacing the Ionising Tubes Fig 12 Switch off the ionising module JONIX duct by turning the luminous On Off switch to O Remove the plug connected to the m...

Страница 23: ...eposition the device JONIX duct by inserting the ionising tubes horizontally into the specific hole using the handle and screw in the 4 screws which secure the brackets to the wall Fig 17 Reinsert the...

Страница 24: ...e device is connected works Verify the presence of power in distribution system Verify that the protection fuse isn t burnt The alarm contact 1 notes the presence of a malfunctioning and the spy is on...

Страница 25: ...ough your municipal authorities as to the location of the eco friendly waste management sites where waste can be received for disposal and its subsequent recycling as recommended Furthermore please no...

Страница 26: ...26 JONIXduct 119 173 76 350 255 196 190 160 90 90 285 9 9 37 5 121 37 5 40 120 ATTACHMENTS OVERALL DIMENSIONS JONIX duct 70MIC2C...

Страница 27: ...35 36 35 350 74 5 74 5 160 190 196 119 173 9 9 37 5 121 37 5 40 120 285 255 OVERALL DIMENSIONS JONIX duct 70MIC4C...

Страница 28: ...28 JONIXduct 119 173 76 255 196 161 90 90 285 534 9 9 37 5 121 37 5 698 40 120 OVERALL DIMENSIONS JONIX duct 70MIC2F...

Страница 29: ...29 JONIXduct 196 255 285 74 5 35 36 35 74 5 160 535 119 173 9 9 121 695 40 120 37 5 37 5 OVERALL DIMENSIONS JONIX duct 70MIC4F...

Страница 30: ...30 JONIXduct NOTES...

Страница 31: ......

Страница 32: ...ters info jonixair com Certified mail jonixsrl legalmail it web www jonixair com Via Tegulaia 10 b 56121 Pisa Italy tel 39 050 985165 Via dell Artigianato 1 35020 San Pietro Viminario PD Italy Tel 39...

Отзывы: