34
d) HYDRAULIC connection preparations with wall-mounted fireplace
e) HYDRAULIC connection preparations with corner fireplace
1.
System flow
2. System return
3. Safety discharge (for closed vessel installation)
4. Aqueduct water (for system loading and cooling coil
for closed vessel installation)
1.
System flow
2. System return
3. Safety discharge (for closed vessel installation)
4. Aqueduct water (for system loading and cooling coil
for closed vessel installation)
Dimension (a) is representative
of a wall with an angle of 90 °.
For an alternative positioning, the installer
is responsible for the sizing.
NOTE
1
2
3
4
1
2
3
4
(a)
Содержание TERMOJOLLY 80 EVO
Страница 42: ...42 NOTES...
Страница 43: ...ENGLISH NOTES 43...