16
CHAP.06 TECHNICAL DATA
06.1 HOMOLOGATION
Technical specifications resulting from laboratory tests conducted according to EN 14785:2006 test methods at the CERTIFICATION
institute.
Description
9 kW
17 kW
UM
Burnt heat output
9,1
18,3
kW
Nominal heat power
8,5
17,0
kW
Reduced heat output
5,0
5,0
kW
Fluid power efficiency
7,5
14,5
kW
Space heating output
1,0
2,5
kW
Consumption at nominal heat output
2,0
3,8
kg/h
Consumption at reduced heat output
1,0
1,0
kg/h
Efficiency at nominal output
93,5
93,0
%
Rated voltage
230
230
V
Rated frequency
50
50
Hz
Electrical absorption min(at full capacity) - max(during start-up)
110 - 345
110 - 345
W
Device weight
165
165
kg
Standard hopper capacity
27,0
27,0
kg
Minimum flue draught at nominal heat output
10,0 [0,10]
11,0 [0,11]
Pa [mbar]
Fume exhaust diameter
80
80
mm
Average fume T at nominal heat output
88,0
126,0
°C
CO (13% O
2
) at nominal heat output
168
130
mg/Nm
3
Dusts (13% O
2
)
15,0
11
mg/Nm
3
OGC (13% O
2
)
11,0
8
mg/Nm
3
NO
X
(13% O
2
)
178,0
125
mg/Nm
3
Mass fume flow at nominal output
8,2
10,7
g/s
Minimum air distance from inflammable side wall
400
400
mm
Minimum air distance from inflammable rear wall
200
200
mm
Frontal air distance from inflammable material
150
150
cm
Testing pressure
6
6
bar
Maximum water working pressure
2,5
2,5
bar
Water content
17
17
l
Heat pump head (@ 1m3/h)
6
6
m
Heating pump maximum capacity (@ 0,5 m.c.l.)
5
5
m
3
/h
Comburent air pipe diameter
60
60
mm
The declared output may vary according to fuel type
The above technical specifications were measured with certified quality PELLETS. ONLY use this type of fuel as
recommended later in
CHAP.06.2 - RECOMMENDED FUELS.
All appliance tests, final inspection and fine-tuning was performed using the recommended certified pellets.. Jolly
Mec Caminetti S.p.A. is not responsible for malfunctions, breakdowns or problems due to the use of pellets that are not
recommended, as combustion parameters vary according to the quality of the pellets.
To achieve best operational results, it may be necessary to change the default factory settings on the control unit during the
“first start-up” commissioning phase. These operations must only be performed by the relative Technical Assistance Centre
(CAT), being the only operators authorised to complete the first start-up activities
WARNING