47
ENGLISH
Description
Daily
From 1 to 3
day
Weekly
Monthly
Annually
As
necessary
Burn pot removal for cleaning
U
Ash tray removal and cleaning
U
Exchanger scraping and cleaning
U
Fume inspection cleaning
U
Fume deflector cleaning and removal
U
Stove body cleaning
U
Cleaning the glass
U
Cleaning the cladding
U
Pellet tank cleaning
U
Cleaning of the flue
T
Stove fume pass cleaning
T
Cleaning of any deposits in the
stove
T
Cleaning of fans
T
Check air breather valves
T
Checking good water circulator
operations
T
Check air breather valves
T
Check expansion tank pressure
T
Check good ignition resistance
operations
T
Check electric/electronic system
integrity
T
Check safety device, thermostat
and pressure switch status and
efficiency
T
Check real water pressure
measurements using the gauge and
electronic pressure transmitter
T
Device cleaning and maintenance schedule chart.
KEY:
U: routine maintenance by the customer user
T: extraordinary maintenance by an authorised Jolly Mec Technical Assistance Centre