background image

FRICK

®

 QUANTUM

™ 

HD VILTER

®

 RETROFIT

INSTALLATION INSTRUCTIONS

090.040-I02 (AUG 2014)

page 12

JOhNSON CONTrOLS

100 CV Avenue
Waynesboro, PA 17268-1206 USA
Phone: 717-762-2121 • FAX: 717-762-8624

www.jci.com/frick

Form 090.040-I02 (2014-08)

Supersedes: NOTHING

Subject to change without notice

Published in USA • 0913 • GUI 1C 

© 2014 Johnson Controls Inc. - 

ALL RIGHTS RESERVED

COMMUNICATIONS

The  use  of  communications  such  as  serial  and  ethernet 
in  industrial  environments  are  commonplace.  The  proper 
installation of these networks is as important to the proper 
operation  of  the  communications  as  all  of  the  preceding 
practices are to the equipment. 
Serial communications cable needs to be of the proper gauge 
based on the total cable distance of the run. Daisy-chaining 
is the only acceptable style of running the communications 
cable. While Star Networks may use less cable, they more 
often than not cause problems and interruptions in communi-
cations, due to varying impedances over the varying lengths 
of cable. Ground or drain wires of the communications cable 
are to be tied together at each daisy-chain connection and 
only taken to ground in the central control system panel.
It is important to carefully consider the type of cable to be 
used. Just because a cable has the proper number of conduc-
tors and is shielded does not mean it is an acceptable cable. 
Johnson Controls-Frick recommends the use of Belden #9829 
for RS-422 communications and Belden # 9841 for RS-485 up 
to 2000 feet (600 Meters) total cable length. Refer to Frick 
drawing 649D4743 for more detail

Comm port protection:

 Surge suppression for the comm 

ports may not be the best method, since suppression is re-
quired to divert excess voltage/current to ground. Therefore, 
the success of these devices is dependent on a good ground 
(covered earlier in this section). This excess energy can be 
quite high and without a proper ground, it will access the 
port and damage it.
Isolation  or  Optical  Isolation  is  the  preferred  comm  port 
protection method. With optical isolation, there is no con-
tinuity between the communications cable and the comm 
port. There is no dependence on the quality of the ground. 
Be  sure  to  know  what  the  voltage  isolation  value  of  the 
optical isolator is before selecting it. These may range from 
500 to 4000 Volts. 
Frick

®

 Optical Isolation Kits are offered under part number 

639C0133G01. One kit is required per comm port.

UpS pOWER AND QUANTUM

HD pANELS

Johnson Controls, Inc. does not advise nor support the use 
of  uninterrupted  power  supply  systems  for  use  with  the 
Quantum

HD panel. With a UPS system providing shutdown 

protection  for  a  Frick  Quantum  panel,  the  panel  may  not 
see the loss of the 3-phase voltage on the motor because 
the  UPS  may  prevent  the  motor  starter  contactor  from 
dropping out. With the starter contactor still energized, the 
compressor auxiliary will continue to feed an “okay” signal 
to the Quantum

HD panel. This may allow the motor to be 

subjected to the fault condition on the 3-phase bus.
A  couple  of  fault  scenarios  are:  1.  The  3-phase  bus  has 
power “on” and “off” in a continuous cycle manner which 
may cause the motor to overheat due to repeated exces-
sive in-rush current experiences. 2. The motor cycling may 
damage  the  coupling  or  cause  other  mechanical  damage 
due to the repeated high torque from rapid sequential motor 
“bumps.” 3. Prolonged low voltage may cause the motor to 
stall  and  possibly  overheat  before  the  motor  contactor  is 
manually turned off.
Under  normal  conditions,  the  loss  of  3-phase  power  will 
shut down the Quantum

HD panel and it will reboot upon 

proper power return. If the panel was in “Auto,” it will come 
back and return to running as programmed. If the unit was 
in  “Remote,”  the  external  controller  will  re-initialize  the 
panel and proceed to run as required. If the panel was in 
“Manual” mode, the compressor will have to be restarted 
manually after the 3-phase bus fault/interruption has been 
cleared / restored.
If the local power distribution system is unstable or prone 
to  problems  there  are  other  recommendations  to  satisfy 
these problems. If power spikes or low or high line voltages 
are the problem, then a constant voltage (CV) transformer 
with a noise suppression feature is recommended. Johnson 
Controls, Inc. can provide these types of transformers for 
this purpose. Contact Johnson Controls for proper sizing (VA 
Rating) based on the requirement of the job. If a phase loss 
occurs, then you will typically get a high motor amp shut-
down. If the problem continues, an analysis of the facility’s 
power supply quality may be necessary.

NOTICE

It is very important to read the installation instructions thoroughly before beginning 
the project. Make sure you have drawings and instructions for the equipment being 
installed. If not, call the manufacturer to receive the proper instructions and draw-
ings. Every manufacturer of electronic equipment should have a knowledgeable staff, 
willing to answer your questions or provide additional information. Following correct 
wiring procedures will ensure proper installation and consequently, proper operation 
of your electronic equipment.

Содержание Frick QUANTUM HD VILTER

Страница 1: ...ck for the latest version of this publication Contents Vilter Retrofit Installation Instructions Frick Quantum HD Retrofit Panels 2 Introduction 2 Instructions 3 Calibration of Temperature Pressure Sensors 6 Calibration of Capacity Volume Slides 6 Installation Of Electronic Equipment Wire Sizing 8 Voltage Source 8 Grounding 9 VFD Applications 9 Conduit 10 Wiring Practices 10 Communications 12 UPS ...

Страница 2: ...ONTROL PANEL These instructions are based on the installer having a fun damental knowledge of refrigeration design and installation Instructions are for conversion to the standard design unit Special package and or control modifications furnished on the existing unit will require deviation from these instructions Contact Frick if you have any questions concerns or prob lems Frick does not take res...

Страница 3: ...eat venting and recovery procedure if neces sary 4 If an oil separator temperature probe well is to be installed drain the oil from the oil separator 5 Take digital photographs of all internal connections of the existing controller to use as a reference when making the connections on the replacement controller Remove the existing panel from the compressor package DO NOT CUT WIRES OR TUBING LINES T...

Страница 4: ... to be replaced with the optical actuators before proceeding The position feedback cable from the capacity and volume slide actuators will be routed back to the QUANTUM HD and through 2 of the 4 holes in the 3 4 strain relief that is provided The capacity slide actuator is the one that is physically higher on the compressor To avoid any incidental damage disconnect the cables for control and signa...

Страница 5: ...12 24 vdc is labeled with the part number and acceptable voltage output range The voltages for the 5 12 24 vdc supplies are as follows 5 vdc range 5 10 5 20 vdc 12 vdc range 12 10 12 20 vdc 24 vdc range 24 2 24 5 vdc The power supplies accept both 120 or 220 VAC input range 100 240 VAC 24 At this point the operating display on the controller should be seen Log in to the controller using a default ...

Страница 6: ...n procedure using the value from the gauge 13 Step to the pre oil filter pressure setting on the Pressure Calibration display Calibration of Capacity Volume Slides Go to Menu Calibration Capacity Volume Once on this screen you can attach the power and signal cables at the optical actuators for the capacity and volume slides The optical actuators used for capacity and volume slide positioning provi...

Страница 7: ... board The red LED will begin flashing at a fast rate 2 Touch the Decrease Volume button on the QUANTUM HD calibration page to drive the volume slide to it s minimum physical position Watching the photo chopper on the actuator control board it will be evident when the volume slide is at the physical stop as the photo chopper will suddenly slow and stop 3 Quickly touch the Decrease Volume button to...

Страница 8: ...pressor package or a Central Control System panel NOTICE It is very important to read the installation instructions thoroughly before beginning the project Make sure you have drawings and instructions with your equipment If not call the manufacturer and request the proper instructions and drawings Every manufacturer of elec tronic equipment should have a knowledgeable staff willing to answer your ...

Страница 9: ... must also be insulated to avoid inadvertent contact at multiple points to ground which could create Ground Loops In many installations that are having electronic control prob lems this essential wire is usually missing is not insulated or improperly sized NEC size ratings are for safety purposes and not necessarily for adequate relaying of noise EMI to earth ground to avoid possible interference ...

Страница 10: ...tage lines in PVC does not reduce these requirements on separation Only running in metal conduit can relieve these requirements Due to the level of EMI that can be induced onto lower voltage lines when running multiple feeders in a trench control power communications analog or signal wiring cannot be run in trenches that house multiple conduits electrical ducts carrying 3 phase power to starters v...

Страница 11: ...e conduit and the enclosure so that if water gets on top of the enclosure it cannot run in between the conduit and the enclosure This is extremely important in outdoor applications NOTICE It is simply NEVER a good practice to enter through the top of an electronic control panel or starter panel that does not already have knockouts provided If knockouts are not provided for this purpose it is obvio...

Страница 12: ...c does not advise nor support the use of uninterrupted power supply systems for use with the Quantum HD panel With a UPS system providing shutdown protection for a Frick Quantum panel the panel may not see the loss of the 3 phase voltage on the motor because the UPS may prevent the motor starter contactor from dropping out With the starter contactor still energized the compressor auxiliary will co...

Отзывы: