Step 4:
.(Figure.36).Close.the.drain.valve.and.refill.the.cooling.
system.with.the.new.coolant.
Figure 36 - refilling the Cooling System
Step 5:
.(Figure.37).Apply.power.to.the.VSD.unit.and.locate.
the.Logic.Board.found.on.the.inside.of.the.cabinet..Unplug.
J2,.which.will.manually.power.the.cooling.pump.to.run.and.
circulate.the.coolant.throughout.the.system..Allow.the.pump.
to.run.(at.least.5.minutes).until.all.trapped.air.is.purged.from.
the.coolant.system.
Figure 37 - VSD logic Board Connection J2
Step 6:
(Figure.38).Top.off.the.cooling.system.until.the.fluid.
level.remains.constant.about.one.inch.(25.mm).from.the.top.
of.the.manifold.
Figure 38 - Topping off the Coolant Supply
Step 7:
(Figure.39).Replace.and.tighten.the.plug.on.the.top.
of.the.manifold.using.an.adjustable.wrench.
Figure 39 - Installing the Cooling System Pipe Plug
Step 8:
(Figure.40).Insert.plug.J2.into.the.logic.board.to.stop.
the.coolant.pump.
Figure 40 - VSD logic Board Connection J2
Содержание Frick 572
Страница 16: ...100 210 IOM FEB 2015 Page 16 VYPER VARIABLE SPEED DRIVE INSTALLATION OPERATION MAINTENANCE Notes ...
Страница 18: ...100 210 IOM FEB 2015 Page 18 VYPER VARIABLE SPEED DRIVE INSTALLATION Figure 7 Vyper Cabinet and Stand ...
Страница 40: ...100 210 IOM FEB 2015 Page 40 VYPER VARIABLE SPEED DRIVE INSTALLATION OPERATION MAINTENANCE Notes ...
Страница 60: ...100 210 IOM FEB 2015 Page 60 VYPER VARIABLE SPEED DRIVE INSTALLATION OPERATION MAINTENANCE Notes ...