Prior.to.Quantum
™
.LX.setup.and.starting.operation.of.the.Vyper
™
.Drive.system,.review.the.following.checklist.to.ensure.all.instal-
lation.requirements.are.met..(Where.Applicable)
.���������������������������Verify.that.the.primary.water.or.glycol.coolant.supply.is.connected.to.the.heat.exchanger.at.the.recom-
mended.flow.and.temperature.recommendations.
.���������������������������Drain.the.shipping.coolant.from.Vyper
™
.and.properly.dispose..Replace.with.running.coolant.(pink).and.purge.
air.from.the.cooling.system...Refer.to.the.“Adding.and.Replacing.Coolant”.portion.of.this.manual.
.���������������������������Verify.that.the.package.temperature.sensors.are.RFI.suppression.type.(639A0151G01)
.���������������������������Environment:
a.. Cleanliness...Keep.construction.debris.out.of.the.cabinet
b.. Confirm.operation.of.internal.cooling.fans.
c.. Confirm.operation.of.coolant.pump.
d.. Confirm.wiring.and.operation.of.the.motor.blower.fans.if.present.
.���������������������������Mounting:
a.. Verify.that.the.Vyper
™
.Drive.is.properly.mounted:.to.the.floor.or.wall.for.remote.mounts.or.to.the.
package.for.package-mounted.units.
b.. Verify.that.the.Vyper
™
.power.leads.running.to.the.motor.do.not.exceed.50.ft.(15.m).long.
.���������������������������Wiring
a.. Verify.control.wiring.has.been.connected.from.the.Quantum
™
LX.panel.to.the.Vyper
™
.in.accordance.
with.the.engineering.drawings.for.the.specific.installation.
b.. Verify.power.wiring.has.been.connected.at.the.correct.connection.points.and.properly.seated.in.accor-
dance.with.the.provided.engineering.drawings.for.the.specific.installation.
c.. Separate.grounded.metal.conduits.must.be.provided.for.input.power,.output.power,.and.control.wir-
ing...Failure.to.provide.separate.conduits.could.result.in.disruption.of.other.electrical.devices.due.to.
harmonics.and.RFI/EMI.generated.in.the.drive.
d.. Wiring.from.the.drive.to.the.motor.be.enclosed.in.a.grounded.metal.conduit.even.if.poured.in.a.con-
crete.floor..PVC.conduit.is.NOT.allowed.
e.. Bond.all.conduit.to.the.cabinet.
f.. Use.the.conduit.knockouts.provided..Avoid.metal.shavings.in.the.drive.enclosure.
g.. Clean.out.all.debris.with.a.low.power.magnet.or.a.vacuum.cleaner.
h.. Protect.signal.wires.from.noise..Use.shielded.and.properly.grounded.control.wires...Noisy.input.sig-
nals.will.cause.erratic.drive.operation.
.���������������������������Apply.power.to.the.Vyper
™
.Drive.system.
a.. Verify.no.problems.exist.with.the.boot-up.of.the.Quantum
™
LX.panel.and.control.system.
b.. Verify.no.problems.exist.with.the.unit.power.supply.connections.
c.. Set.up.the.Quantum
™
LX.panel.in.accordance.with.job.site.requirements...Refer.to.“Quantum
™
LX.
Panel.Setup”.in.the.“Operation”.portion.of.this.manual.
d.. Set.the.FLA.rating.on.the.Vyper
™.
Logic.board.as.per.job.site.requirements.
e.. Confirm.dipswitches.on.the.Vyper
™
.Logic.Board.are.properly.set..Refer.to.the.“VSD.Logic.Board.
Setup”.section.found.later.in.this.manual.
Содержание Frick 572
Страница 16: ...100 210 IOM FEB 2015 Page 16 VYPER VARIABLE SPEED DRIVE INSTALLATION OPERATION MAINTENANCE Notes ...
Страница 18: ...100 210 IOM FEB 2015 Page 18 VYPER VARIABLE SPEED DRIVE INSTALLATION Figure 7 Vyper Cabinet and Stand ...
Страница 40: ...100 210 IOM FEB 2015 Page 40 VYPER VARIABLE SPEED DRIVE INSTALLATION OPERATION MAINTENANCE Notes ...
Страница 60: ...100 210 IOM FEB 2015 Page 60 VYPER VARIABLE SPEED DRIVE INSTALLATION OPERATION MAINTENANCE Notes ...