FIGURE 6 -
SUSPENDED UNITS
SIDE OF UNIT
SIDE OF UNIT
LD14006
INSTALLATION
This equipment must be installed in strict accordance
with any applicable local, state, and national codes
including but not limited to building, electrical, and
mechanical codes. On single wall equipment, lay rig-
id temporary protection, such as plywood, inside of
equipment to protect insulation during installation.
Suspended Units
When the equipment is to be suspended from a ceil-
ing, a base rail, angle iron, or channel must support
the equipment. The MQL product line is not designed
to be suspended from the top of the equipment. Be-
fore hanging the equipment, all field assembly must
be completed.
Suspending Using Factory Base Rail
The factory optional base rails have a 5/8” diameter
hole located in each corner for hanger rods. A hanger
rod must be installed in each corner of a module to
properly support the equipment and maintain unit’s
structural integrity.
Hanger rods must be located so that they
do not interfere with access panels.
JOHNSON CONTROLS
13
FORM ET102.19-NOM1
ISSUE DATE:08/26/2013
2
SECTION 2 - INSTALLATION