background image

501028-UIM-C-1209

Johnson Controls Unitary Products

21

SECTION VII: COMBUSTION AIR AND 

VENT SYSTEM

COMBUSTION AIR AND VENT SAFETY

This Category IV, dual certified direct vent furnace is designed for resi-
dential application. It may be installed without modification to the con-
densate system in a basement, garage, equipment room, alcove, attic
or any other indoor location where all required clearance to combusti-
bles and other restrictions are met. The combustion air and the venting
system must be installed in accordance with Section 5.3, Air for Com-
bustion and Ventilation, of the National Fuel Gas Code Z223.1/NFPA 54
(latest edition), or Sections 7.2, 7.3 or 7.4 of CSA B149.1, National Gas
and Propane Codes (latest edition) or applicable provisions of the local
building code and these instructions.

COMBUSTION AIR/VENT PIPE SIZING

The size of pipe required will be determined by the furnace model, the
total length of pipe required and the number of elbows required.

Table 7 lists the maximum equivalent length of pipe allowed for each
model of furnace. The equivalent length of elbows is shown in Table 9.
The equivalent length of the vent system is the total length of straight
pipe PLUS the equivalent length of all of the elbows.

The following rules must also be followed:

1.

Long radius (sweep) elbows are recommended. Standard elbows
may be used, but since they have a longer equivalent length, they
will reduce the total length of pipe that will be allowed. Short radius
(plumbing vent) elbows are not allowed. The standard dimensions
of the acceptable elbows are shown below.

2.

The maximum equivalent length listed in Table 7 is for the vent pip-
ing and the air intake piping separately. For example, if the table
allows 65 equivalent feet for a particular model, then the vent can
have 65 equivalent feet of pipe, AND the combustion air intake can
have another 65 equivalent feet of pipe.

3.

Three vent terminal elbows (two for the vent and one for the com-
bustion air intake) are already accounted for and need not be
included in the equivalent length calculation.

4.

All combustion air and vent pipe must conform to American
National Standards Institute (ANSI) and American Society for Test-
ing and Materials (ASTM) standards D1785 (Schedule 40 PVC),
D2665 (PVC-DWV), F891 (PVC-DWV Cellular Core), D2261
(ABS-DWV) or F628 (Schedule 40 ABS). Pipe cement and primer
must conform to ASTM Standard D2546 (PVC) or D2235 (ABS). If
ABS pipe is to be used, any joint where ABS pipe is joined to PVC
pipe must be glued with cement that is approved for use with
BOTH materials. Metallic materials must not be used for venting or
air intake.

5.

If a flexible connector is used in the vent system, it must be made
of a material that is resistant to acidic exposure and to at least
225°F (107°C) temperature. Flexible connectors are also allowed
in the combustion air pipe. 

6.

All models are supplied with 2" (5.1 cm) vent connections. When
the pipe must be increased to 3" (7.6 cm) diameter, the transition
from 2" to 3" must be done as close to the furnace as possible. For
upflow models, the transition from 2" to 3" should be done immedi-
ately above the furnace. For downflow or horizontal models, the
transition from 2" to 3" pipe should be done immediately after exit-
ing the furnace.

7.

In Canada, vents shall be certified to ULC S636, Standard for Type
BH Gas Venting Systems.

8.

In Canada, the first three feet (91.4 cm) of the vent must be readily
accessible for inspection.

9.

For single pipe systems it is recommended to install the combus-
tion air coupling provided and install approximately 18” (46 cm) of
PVC pipe on the furnace.

10. Minimum vent length for all models is 5 feet (1.5 m).

Dimensions are those required in Standard ASTM D-3311.

The “VENT SYSTEM” must be installed as specified in these
instructions for Residential and non-HUD Modular Homes. The
direct vent system is the only configuration that can be installed in a
non-HUD Modular Home.

 This furnace may not be common vented with any other appliance,
since it requires separate, properly sized air intake and vent lines.
The furnace shall not be connected to any type of B, BW or L vent
or vent connector, and not connected to any portion of a factory-
built or masonry chimney.
The furnace shall not be connected to a chimney flue serving a sep-
arate appliance designed to burn solid fuel.

When combustion air pipe is installed above a suspended ceiling or
when it passes through a warm and humid space, the pipe must be
insulated with 1/2” Armaflex or other heat resistant type insulation if
two feet or more of pipe is exposed.
Vent piping must be insulated if it will be subjected to freezing tem-
peratures such as routing through unheated areas or through an
unused chimney.

TABLE 7: 

Maximum Equivalent Pipe Length

Model Input 

BTUH (kW)

Pipe Size 

Inches (cm)

Maximum 

Equivalent 

length feet (m)

60,000 (17.6)

2 (5.1)

65 (19.8)

60,000 (17.6)

3 (7.6)

90 (27.4)

80,000 (23.4)

2 (5.1)

65 (19.8)

80,000 (23.4)

3 (7.6)

90 (27.4)

100,000 (29.3)

2 (5.1)

30 (9.2)

100,000 (29.3)

3 (7.6)

90 (27.4)

120,000 (35.1)

2 (5.1)

30 (9.2)

120,000 (35.1)

3 (7.6)

90 (27.4)

 FIGURE 26:  

Dimensions

TABLE 8: 

Elbow Dimensions

Elbow "A" Dimension

2" Standard

2-5/16"

3" Standard

3-1/16"

2" Sweep

3-1/4"

3" Sweep

4-1/16"

A

A

A

A

STANDARD ELBOW

LONG (SWEEP) ELBOW

Содержание TM9X060B12MP11

Страница 1: ...ical Combustion Pipe Drain Tee 16 Upflow Configuration 17 Downflow Configuration 18 Horizontal Left Configuration 19 Horizontal Right Configuration 20 Dimensions 21 Home Layout 23 Termination Configur...

Страница 2: ...ce Air filters in place Set furnace input rate and temperature rise per rating plate marking Means for providing outdoor air required for combustion Return air temperature maintained between 55 F 13 C...

Страница 3: ...al codes the installation must comply with the national codes listed below and all authorities having jurisdiction In the United States and Canada follow all codes and standards for the following usin...

Страница 4: ...n FOR FURNACES INSTALLED IN THE COMMON WEALTH OF MASSACHUSETTS ONLY For all side wall horizontally vented gas fueled equipment installed in every dwelling building or structure used in whole or in par...

Страница 5: ...access cover shall be attached in such a manner as to prevent leaks DUCT FLANGES Four flanges are provided to attach ductwork to the furnace These flanges are rotated down for shipment In order to use...

Страница 6: ...ould always be installed on the side desig nated as top side See Figure 4 5 FURNACE ASSEMBLY PC SERIES COILS These upflow coils are designed for installation on top of upflow fur naces only If the coi...

Страница 7: ...e unit BOTTOM RETURN AND ATTIC INSTALLATIONS Bottom return applications normally pull return air through a base plat form or return air plenum Be sure the return platform structure or return air plenu...

Страница 8: ...proper and quiet fur nace operation When suspending the furnace use a secure platform constructed of plywood or other building materials secured to the floor or ceiling joists Refer to Figure 11 for...

Страница 9: ...ombustion Air Inlet Gas Pipe Entry Electrical Entry Condensate Drain Optional Return Air Cutout Either side 29 5 For Cladded door add appoximately an additional 75 C SUPPLY END 56 56 20 B 3 23 8 56 Co...

Страница 10: ...cted from either side of the furnace using any of the gas pipe entry knockouts on both sides of the furnace Refer to Figure 13 All filters and mounting provision must be field supplied All installa ti...

Страница 11: ...0 87 0 87 0 87 850 3 5 3 5 3 5 31 7 0 87 0 87 0 87 900 3 5 3 5 3 5 33 5 0 87 0 87 0 87 950 3 5 3 5 3 3 35 4 0 87 0 87 0 81 1000 3 5 3 2 2 9 37 3 0 87 0 80 0 73 1050 3 5 2 9 2 7 39 1 0 87 0 73 0 67 110...

Страница 12: ...mostat set in the OFF position and the main electrical source disconnected connect the thermostat wiring from the wiring connections on the thermostat to the terminal board on the ignition module as s...

Страница 13: ...ner Single Stage Furnace HM1 Humidistat Y Full Stage Compressor G Fan PP11C70224 THERMOSTAT RH 24 Volt Hot Heat XFMR RC 24 Volt Hot Cool XFMR W Full Stage Heat Clipping Jumper W914 for electric heat o...

Страница 14: ...E B E ZD E R OD MODELS HGD HP RHS O Reversing Valve Energized in Cool C 24 Volt Common R 24 Volt Hot W1 66 out Heat Y Compressor DEMAND DEFROST CONTROL X L Malfunction Light W Auxiliary Heat SINGLE ST...

Страница 15: ...drains are combined with the furnace drain then the open stand pipe could be raised higher above the 5 minimum The Figures 22 25 show the condensate drain arrangement for the various possible furnace...

Страница 16: ...to tempera tures below freezing adequate measures must be taken to prevent the drain line from freezing Failure to provide proper protection from freezing can result in improper operation or damage t...

Страница 17: ...ff so that no sagging loops will collect and hold condensate which will cause the furnace to not operate Shorten pressure switch hose Re route and shorten pressure switch hose Shorten rain gutter hose...

Страница 18: ...tch hose to this position NOTE May require the longer hose that is provided with wider cabinets Move condensate drain hose to this position May exit either side of the cabinet Move rain gutter hose to...

Страница 19: ...se to this position NOTE May require the longer hose that is provided with wider cabinets Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this position Move...

Страница 20: ...ting provided Move condensate drain hose to this position Move rain gutter hose to this position Change condensate drain connection to the 90 fitting provided Move condensate drain hose to this positi...

Страница 21: ...th cement that is approved for use with BOTH materials Metallic materials must not be used for venting or air intake 5 If a flexible connector is used in the vent system it must be made of a material...

Страница 22: ...o prevent sagging 9 Seal around the openings where the combustion air and or vent piping pass through the roof or sidewalls COMBUSTION AIR VENTING TABLE 9 Equivalent Length of Fittings Fitting Equival...

Страница 23: ...quirements of the gas supplier 12 30 5 cm or in accordance with local installation codes and the requirements of the gas supplier F Clearance to outside corner 12 30 5 cm or in accordance with local i...

Страница 24: ...om inside the building The vent for a single pipe system must be installed as specified in the venting section of these instructions with the vent terminating as shown in Figure 28 Each furnace must h...

Страница 25: ...he space surrounding the appliance This may be from within the space in a non confined location or it may be brought into the furnace area from outdoors through permanent openings or ducts It is not p...

Страница 26: ...Two per manent openings shall communicate directly or by means of ducts with the outdoors crawl spaces or attic spaces 2 One permanent openings commencing within 12 30 5 cm of the top of the enclosure...

Страница 27: ...e following steps shall be followed for each appliance connected to the venting system being placed into operation while all other appliances connected to the venting system are not in operation 1 Ins...

Страница 28: ...proper input rate using natural gas with a heating value of 1030 BTU Ft3 38 4 MJ m3 If the heating value of your gas is significantly different it may be necessary to replace the orifices Verify natur...

Страница 29: ...300 750 78 46 92 231 25 144 288 720 80 45 90 225 26 138 277 692 82 44 88 220 27 133 267 667 84 43 86 214 28 129 257 643 86 42 84 209 29 124 248 621 88 41 82 205 30 120 240 600 90 40 80 200 31 116 232...

Страница 30: ...lies on and follow the operating instructions to place the unit back in operation 3 Adjust manifold pressure by adjusting gas valve regulator screw for the appropriate gas per the following 4 After th...

Страница 31: ...must be long enough to adequately cool the furnace but not so long that cold air is blown into the heated space The fan off timing may be adjusted by positioning the jumper on two of the four pins as...

Страница 32: ...4 0 5 0 6 0 7 0 8 0 9 1 0 TM9X060B12MP11 High 1402 1374 1354 1328 1299 1262 1222 1167 1107 1036 Medium High 1252 1233 1203 1182 1150 1125 1095 1064 1031 980 Medium 1076 1059 1029 1007 973 946 908 883...

Страница 33: ...hut down there is a call for heat the furnace will initiate a normal start cycle If the problem has not been corrected the furnace will again lockout after three retries A momentary loss of gas supply...

Страница 34: ...n after correcting the failure condition 12 RED FLASHES This code indicates an open igniter circuit which could be a disconnected or loose wire or a cracked or broken igniter STEADY ON RED Control fai...

Страница 35: ...ING FERRULE 3 req d GASKET FOAM Door 1 5 ft req d GROMMET 3 req d HARNESS WIRING HOSE CONDENSATE HOSE RAIN GUTTER KNOB QUARTER TURN 4 req d MOTOR MOUNT ORIFICE BURNER Natural 45 PAN CONDENSATE PLUG SE...

Страница 36: ...shed in U S A 501028 UIM C 1209 Copyright 2009 by Johnson Controls Inc All rights reserved Supersedes 501028 UIM B 0509 Johnson Controls Unitary Products 5005 York Drive Norman OK 73069 SECTION XII WI...

Отзывы: