This Commissioning Checklist is to be completed in full by the competent person who commissioned the warm air unit and associated
equipment as a means of demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for
future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
WARM AIR HEATER AND CIRCULATOR COMMISSIONING CHECKLIST
Customer name:
Telephone number:
Address:
Warm Air Unit Make and Model
Warm Air Unit Serial Number
Commissioned by (PRINT NAME):
Gas Safe Reg. No.
Company name:
Telephone number:
Company address:
Commissioning date:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Building Regulations Notification Number (if applicable)
CONTROLS
(tick the appropriate boxes if applicable)
Time and temperature control to heating
Room thermostat and programmer/timer
Programmable Roomstat
Load/weather compensation
Optimum start control
Time and temperature control to hot water
Cylinder thermostat and programmer/timer
Warm air unit
Heating zone valves
Fitted
Not required
Hot water zone valves
Fitted
Not required
Thermostatic radiator valves
Fitted
Not required
Automatic bypass system
Fitted
Not required
Warm Air Unit Interlock
Yes
No
If YES
Volume:
Litres
FOR WARM AIR HEATERS ONLY
Has the system been balanced in accordance with the heater manufacture’s instructions?
Yes
No
Was an anemometer used?
Yes
No
Have balancing dampers been fitted?
Yes
No
FOR WARM AIR HEATING: MEASURE AND RECORD
Burner operating pressure
mbar
Heat input
kW
Temperature difference between return air inlet and nearest outlet
°C
FOR HOT WATER GENERATORS:
measure and record
Burner operating pressure
mbar
Heat input
kW
Water flow temperature
°C
ALL INSTALLATIONS
The heating and hot water system complies with the appropriate Building Regulations
Yes
The system and associated products have been installed and commissioned in accordance with the manufacturer’s instructions
Yes
The efficient operation of system and its controls have been demonstrated to and understood by the customer
Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm demonstration of equipment and receipt of appliance instructions)
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
Содержание 42-451-14
Страница 24: ...www johnsonandstarley co uk 24 11 WIRING DIAGRAMS Fig 5a MODAIRFLOW CIRCUIT DIAGRAM...
Страница 25: ...25 Sales Spares Replacement Help Line 01604 762881 Fig 5b Non MODAIRFLOW CIRCUIT DIAGRAM...
Страница 26: ...www johnsonandstarley co uk 26 12 FUNCTIONAL DIAGRAMS Fig 6a Non MODAIRFLOW FUNCTIONAL DIAGRAM...
Страница 27: ...27 Sales Spares Replacement Help Line 01604 762881 Fig 6b MODAIRFLOW FUNCTIONAL DIAGRAM...
Страница 28: ...www johnsonandstarley co uk 28 13 DIMENSIONS Fig 7 HI SPEC J65 DIMENSIONS...
Страница 29: ...29 Sales Spares Replacement Help Line 01604 762881 14 NOTES...
Страница 31: ...31 Sales Spares Replacement Help Line 01604 762881 16 EXPLODED DIAGRAM Fig 8 HI SPEC J65 EXPLODED DIAGRAM...