Code Of Practice

For the installation, commissioning and servicing  
of domestic heating and hot water products

Benchmark places responsibilities on 
both manufacturers and installers.*   
The purpose is to ensure that 
customers** are provided with the 
correct equipment for their needs, that it 
is installed, commissioned and serviced 
in accordance with the manufacturer’s 
instructions by competent persons 
and that it meets the requirements of 
the appropriate Building Regulations. 
Installers are required to carry out work  
in accordance with the following:

Standards of Work

•  

Be competent and qualified to undertake the work 

required.

•  

Install, commission, service and use products in 

accordance with the manufacturer’s instructions provided.

•  

Ensure that where there is responsibility for design work, 

the installation is correctly sized and fit for purpose.

•  

Meet the requirements of the appropriate Building 

Regulations. Where this involves notifiable work be a 

member of a Competent Persons Scheme or confirm that 

the customer has notified Local Authority Building Control 

(LABC), prior to work commencing.

•  

Complete all relevant sections of the Benchmark 

Checklist/Service Record when carrying out 

commissioning or servicing of a product or system.

•  

Ensure that the product or system is left in a safe 

condition and, whenever possible, in good working order.

•  

Highlight to the customer any remedial or improvement 

work identified during the course of commissioning or 

servicing work.

•  

Refer to the manufacturer’s helpline where assistance is 

needed.

•  

Report product faults and concerns to the manufacturer  

in a timely manner.

Customer Service

•  

Show the customer any identity card that is relevant to 

the work being carried out prior to commencement or on 

request.

•  

Give a full and clear explanation/demonstration of the 

product or system and its operation to the customer.

•  

Hand over the manufacturer’s instructions, including the 

Benchmark Checklist, to the customer on completion of 

an installation.

•  

Obtain the customer’s signature, on the Benchmark 

Checklist, to confirm satisfactory demonstration and 

receipt of manufacturer’s instructions.

•  

Advise the customer that regular product servicing is 

needed, in line with manufacturers’ recommendations,  

to ensure that safety and efficiency is maintained.

•  

Respond promptly to calls from a customer following 

completion of work, providing advice and assistance by 

phone and, if necessary, visiting the customer.

•  

Rectify any installation problems at no cost to the 

customer during the installer’s guarantee period.

* The use of the word “installer” is not limited to installation itself and covers 

those carrying out installation, commissioning and/or servicing of heating  

and hot water products, or the use of supporting products (such as water 

treatment or test equipment). 

**Customer includes householders, landlords and tenants.

© Heating and Hotwater Industry Council (HHIC)

www.centralheating.co.uk

M15262_Code_of_Practice.indd   1

6/12/07   15:57:01

Содержание 42-451-14

Страница 1: ...N G H O T W AT E R V E N T I L AT I O N HI SPEC J65 Warm Air Heater with Modairflow or Non Modairflow Control Hi Spec J65 G C No 42 451 14 These instructions are to be left with the User Publication...

Страница 2: ...ill be required in the event of any warranty work and as supporting documentation relating to home improvements in the optional documents section of the Home Improvements In the interest of continuous...

Страница 3: ...culating fan 3 Fuse s 4 Time control 5 Data plate 6 Limit switch 7 Multifunctional control 8 Pilot burner 9 Burner and Control Assembly 10 Gas connection 11 Airflow sensor Modairflow models 12 Fan Del...

Страница 4: ...on of BS 5864 provided that in addition all internal surfaces including the base are non combustible or lined with non combustible material This requirement is applicable only to dwellings of more tha...

Страница 5: ...guidelines in the British System Design Manual to suit the needs of its specific heating requirements and building layout The type of duct system i e radial extended plenum stepped should be installe...

Страница 6: ...istance can be achieved practicably by some means Where this is not practicable the existing flue system may be used providing there is no evidence of spillage from the old appliance see 5 1 9 above E...

Страница 7: ...ion Example A warm air unit with a 100 mm diameter flue spigot fitted with a pre fabricated flue system leading to a ridge tile in the loft refer Fig 2 From table 3 Kia Inlet resistance of actual flue...

Страница 8: ...Important Before installing the appliance carry out a visual check of the flue system as directed in the relevant section of BS5440 Pt 1 then check the flue performance as follows a Close all doors a...

Страница 9: ...nt gas supply pipe from the meter is to be preferred wherever possible When this is not possible the pipe must be capable of taking the complete input of the heater and all other gas appliances being...

Страница 10: ...luid sealing any leaks found 6 3 13 Allow the heater to operate for a minimum of 15 minutes to ensure stability 7 servicing The gas pipe should be so fitted and installed as to be durable substantial...

Страница 11: ...efore continuing 6 6 2 With the Main Burner operating continuously check that the temperature rise across heater is between 45o C 55o C setting the fan speed accordingly decrease fan speed to increase...

Страница 12: ...iance ON 6 8 9 Ignite the Main and Pilot Burners as detailed in sub para 6 3 1 to 6 3 5 6 8 10 Ensure that the Limit Switch operates indicated by the Main Burner extinguishing within 120 and 180 secon...

Страница 13: ...NCE IMPORTANT Ensure gas and electricity supplies are isolated before commencing any maintenance or replacement of components After completion of any maintenance always test for gas soundness and carr...

Страница 14: ...5 minutes to ensure stability and with the main burner lit ensure that the operation of Air Circulation fan does not affect the main burner flame profile 8 2 BURNERAND CONTROLASSEMBLY REMOVAL 8 2 1 En...

Страница 15: ...the Piezo retaining nut and remove the unit from its mounting bracket 8 7 3 Refitting or replacement is in reverse order 8 8 AIR CIRCULATINGFAN REMOVALAND CLEANING 8 8 1 Ensure that the electrical sup...

Страница 16: ...trol and remove by partially withdrawing the bottom of the Time Control and then lifting upwards 8 12 3 Disconnect the Time Control electrical connections from the integral terminal strip 8 12 4 Refit...

Страница 17: ...d In the event of heat exchangerreplacement being necessary contact Johnson and Starley Service Department 9 DEFECT DIAGNOSIS 9 1 IMPORTANT If an electrical defect occurs afterinstallation of the appl...

Страница 18: ...trical defect occurs afterinstallation of the appliance preliminary earth continuity polarity and resistance to earth checks should be carried out with a multimeter On completion of any maintenance fa...

Страница 19: ...ommended procedure Non MODAIRFLOW models j Pilot alight but main i Mains electrical supply not Check mains supply burner not igniting connected to heater ii Controls not demanding heat Check that time...

Страница 20: ...CHECKFORVOLT AGE ATFANLIVETO NEUTRAL MAIN BURNER ON BUT FAN NOT RUNNING Y REPLACEFAN DOES FAN START N BRIDGEOUT AIRFLOWSENSOR Y REPLACE AIRFLOWSENSOR REPLACE TRANSFORMER REPLACE MULTIFUNCTIONAL CONTRO...

Страница 21: ...230 V N Y N Y REPLACE FUSE N Y REPLACE MULTIFUNCTIONAL CONTROL SET CONTROLS CORRECTLY Y N CHECK POLARITY OF THERMISTA STAT CONNECTIONS Y IS POLARITY CORRECT N RECTIFY DEFECT Y BRIDGETHERMISTA STAT TER...

Страница 22: ...C CHECK TTB LIMIT SWITCH CONNECTIONS Y Y CHECKMAINBURNER PRESSURESETTINGS ARECORRECT SET TO CORRECT PRESSURE SETTING N Y SET FAN BALANCING SCREW Y DOES FAN SPEED UP N Y REPLACE ELECTRONIC MODULE REPL...

Страница 23: ...SENSOR Y DOES FAN STILL RUN REPLACE ELECTRONICS MODULE Y IS PILOT FLAME TOO BIG N Y ADJUST PILOT FLAME TO CORRECT SETTING REPLACE AIRFLOW SENSOR N MAIN BURNER ONLYFIRES FOR SHORT PERIODS DEFECT IS IN...

Страница 24: ...www johnsonandstarley co uk 24 11 WIRING DIAGRAMS Fig 5a MODAIRFLOW CIRCUIT DIAGRAM...

Страница 25: ...25 Sales Spares Replacement Help Line 01604 762881 Fig 5b Non MODAIRFLOW CIRCUIT DIAGRAM...

Страница 26: ...www johnsonandstarley co uk 26 12 FUNCTIONAL DIAGRAMS Fig 6a Non MODAIRFLOW FUNCTIONAL DIAGRAM...

Страница 27: ...27 Sales Spares Replacement Help Line 01604 762881 Fig 6b MODAIRFLOW FUNCTIONAL DIAGRAM...

Страница 28: ...www johnsonandstarley co uk 28 13 DIMENSIONS Fig 7 HI SPEC J65 DIMENSIONS...

Страница 29: ...29 Sales Spares Replacement Help Line 01604 762881 14 NOTES...

Страница 30: ...ss Lighting Injector Bray 1 or E02 423 1000 0705310 Cross Lighting Injector Stereomatic 1 20 E02 556 J652 0350005 Heat Exchanger exchange kit 1 21 395 945 1000 0700570 Piezo Unit 1 22 244 971 B300 070...

Страница 31: ...31 Sales Spares Replacement Help Line 01604 762881 16 EXPLODED DIAGRAM Fig 8 HI SPEC J65 EXPLODED DIAGRAM...

Страница 32: ...Adapter Kit PAK65 4 Return Air Kit RAK65 5 Cleanflow Electronic Air Cleaner CF 90H 6 Replacement Pads A0354X0357 Warm Air Heating fully complies with PART L OF THE BUILDING REGULATIONS by following t...

Страница 33: ...to the customer any remedial or improvement work identified during the course of commissioning or servicing work Refer to the manufacturer s helpline where assistance is needed Report product faults...

Страница 34: ...Automatic bypass system Fitted Not required Warm Air Unit Interlock Yes No If YES Volume Litres FOR WARM AIR HEATERS ONLY Has the system been balanced in accordance with the heater manufacture s instr...

Страница 35: ...Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Operative ID No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Operative ID No Comments Signatur...

Страница 36: ...sales johnsonandstarley co uk marketing johnsonandstarley co uk Reception Customer Service 01604 762881 Fax 01604 767408 Anniversary 1922 2012 In the interest of continuous development Johnson Starley...

Отзывы: