SECTION 4 – MACHINE OPERATION
31210162
– JLG Lift –
4-17
4.12 TIE-DOWN/LIFT LUGS
Tie Down
When transporting the machine:
- Platform must be fully lowered in the stowed position.
- Machine must be tied down to the truck bed or trailer deck as
shown in Figure 4-9.
Figure 4-9. Machine Tie-Down
Lifting
When lifting the machine:
- Platform must be fully lowered in the stowed position.
- Remove all loose items from the machine.
- Attach lifting straps/chains at BOTH lifting lugs as shown in
Figure 4-10. Lifting the Machine
Содержание Toucan 12E
Страница 2: ......
Страница 12: ...TABLE OF CONTENTS vi JLG Lift 31210162 NOTES...
Страница 22: ...SECTION 1 SAFETY PRECAUTIONS 1 10 JLG Lift 31210162 NOTES...
Страница 34: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 JLG Lift 31210162 NOTES...
Страница 50: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 16 JLG Lift 31210162 Figure 3 9 Decal Installation Sheet 2...
Страница 51: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 31210162 JLG Lift 3 17 Figure 3 10 Decal Installation Sheet 3...
Страница 54: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 20 JLG Lift 31210162 NOTES...
Страница 58: ...SECTION 4 MACHINE OPERATION 4 4 JLG Lift 31210162 Figure 4 3 Grade and Side Slope...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 20 JLG Lift 31210162 NOTES...
Страница 81: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 5 Figure 6 2 Range Diagram 8E XL...
Страница 93: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 17 Battery Troubleshooting...
Страница 135: ......