SECTION 4 – MACHINE OPERATION
31210162
– JLG Lift –
4-15
1.
Connect the
AC input plug (1)
to a grounded outlet.
2.
When first powered up, the charger will go through a
short LED indicator self-test. The battery charger light’s
on the Ground Control Station will flash in sequence for
two seconds.
3.
The batteries are fully charged when the green light on
the battery charger status panel (Ground Control Sta-
tion) is illuminated.
NOTE:
If the charger is left plugged in, the charger will automati-
cally restart a complete charge cycle if the batteries volt-
age drops below a minimum voltage or 30 days has
elapsed.
Содержание Toucan 12E
Страница 2: ......
Страница 12: ...TABLE OF CONTENTS vi JLG Lift 31210162 NOTES...
Страница 22: ...SECTION 1 SAFETY PRECAUTIONS 1 10 JLG Lift 31210162 NOTES...
Страница 34: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 JLG Lift 31210162 NOTES...
Страница 50: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 16 JLG Lift 31210162 Figure 3 9 Decal Installation Sheet 2...
Страница 51: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 31210162 JLG Lift 3 17 Figure 3 10 Decal Installation Sheet 3...
Страница 54: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 20 JLG Lift 31210162 NOTES...
Страница 58: ...SECTION 4 MACHINE OPERATION 4 4 JLG Lift 31210162 Figure 4 3 Grade and Side Slope...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 20 JLG Lift 31210162 NOTES...
Страница 81: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 5 Figure 6 2 Range Diagram 8E XL...
Страница 93: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 17 Battery Troubleshooting...
Страница 135: ......