SECTION 6 – GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
31210162
– JLG Lift –
6-27
6.9 OVERLOAD SYSTEM VERIFICATION (if
equipped)
Interval - At least every 6 month of operation.
1.
Turn machine power on at ground control station.
2.
Place a 200kg load evenly distributed on platform floor:
- No alarm should be triggered.
3.
Add weight on platform (additional load not to exceed
30kg) until the overload warning is activated:
- RED light indicators at both the ground and the plat-
form control stations blink.
- An audible alarm sounds.
- All functions are disabled.
4.
Remove additional load. Apply a slight force (
F
) on the
platform:
- Alarms stop.
5.
If the overload warning is not activated after the addition
of 30kg, have the overload system calibrated by a quali-
fied technician before replacing machine into service.
Figure 6-16. Overload System Verification
Содержание Toucan 12E
Страница 2: ......
Страница 12: ...TABLE OF CONTENTS vi JLG Lift 31210162 NOTES...
Страница 22: ...SECTION 1 SAFETY PRECAUTIONS 1 10 JLG Lift 31210162 NOTES...
Страница 34: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 2 12 JLG Lift 31210162 NOTES...
Страница 50: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 16 JLG Lift 31210162 Figure 3 9 Decal Installation Sheet 2...
Страница 51: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 31210162 JLG Lift 3 17 Figure 3 10 Decal Installation Sheet 3...
Страница 54: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 20 JLG Lift 31210162 NOTES...
Страница 58: ...SECTION 4 MACHINE OPERATION 4 4 JLG Lift 31210162 Figure 4 3 Grade and Side Slope...
Страница 74: ...SECTION 4 MACHINE OPERATION 4 20 JLG Lift 31210162 NOTES...
Страница 81: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 5 Figure 6 2 Range Diagram 8E XL...
Страница 93: ...SECTION 6 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 31210162 JLG Lift 6 17 Battery Troubleshooting...
Страница 135: ......