PAGE 20 of 35
4.11.1. Cable Management Dovetail Mount
To attach the cable management, follow these steps:
1.
Loosen the knob on the cable management dovetail mount. Slide the mount
onto the dovetail link
(Fig. 63)
.
2.
Once centred on the dovetail link, tighten the cable management’s dovetail
mount knob
(Fig. 64)
.
4.11.2. Cable Management Setup
The cable management is offered in a variety of lengths and provides a means
of bundling and protecting cables and hoses that run to the scanner.
1.
Open the cable management and cable latch. Begin at the tube’s dovetail
mount and place the cabling in the tube
(Fig. 65)
.
Fig. 63
- Loosen and slide on
Fig. 64
- Tighten knob
Fig. 65
- Insert cables and hoses
Fig. 66
- Zip up to close
Содержание STIX BGG008
Страница 1: ...STIX Magnetic Corrosion Scanner BG0100 Rev 05 3 ...
Страница 5: ...PAGE iv of iv ...
Страница 27: ...PAGE 22 of 35 Chapter 5 CONFIGURATION 5 1 Standard Configuration Fig 72 Standard configuration ...
Страница 41: ...Jireh Industries Ltd 53158 Range Road 224 Ardrossan Alberta Canada T8E 2K4 780 922 4534 jireh com ...