Chapter V Operating Procedures and Steps
5.1 Operation Instructions
This series of withstand voltage tester is mainly used for general production line or quality
inspection, its operation and setting are very simple. Irrational settings and operations will not
respond.
5.2 Operation steps
Follow this procedure and steps to operate the instrument:
1. Before connecting the input power cord plug of this instrument to the mains power supply,
please turn off the input
“
power switch
”
of this instrument.
And switch the "voltage selection" switch on the rear panel to the correct input voltage position,
and check whether the specifications of the fuse are correct. Then connect the ground wire to the
"ground terminal" on the rear panel of the instrument.
2. Connect the input power cord to the power socket of the instrument. Do not connect the
high-voltage test lead to the high-voltage output terminal of the instrument first.
3. Connect all the test leads of the DUT, then connect the loop wires to the tested end of the
instrument, and finally connect the high-voltage test leads to the high-voltage terminals of the
instrument, and check whether all the test leads are all connected OK.
Turn on the input
“
power switch
”
of the instrument. After the program displays the instrument
model, it will automatically display the group and test parameter information of the last test of
the instrument, and enter the test and parameter setting mode. At this time, the display will show:
AC withstand voltage test
DC withstand voltage test
ACW SETUP
XXX.XS
or
DCW SETUP
XXX.XS
MX
X.XXKV
XX.XXmA
MX
X.XXKV
XX.XXmA
Insulation resistance test
Ground resistance test
If you want to reset the test parameters, press the "SET" key to set the parameters. For detailed
setting methods and steps, please refer to the description of "test parameter settings".
5
.
Press the "Start" switch again to output high voltage. At this time, the high voltage indicator
next to the red "
" symbol on the panel will flash, and the timer will start to count at the
same time. Do not touch the object under test while the test is in progress.