BW 2 03 01 / 2

Storage of the chlorine barrels and connection of the
chlorinators

The barrels have to be stored horizontally on supports.
Remove the protective cap of the valve right before
connection of the lines.

Caution:

Make sure that the 

gas supply

 of the barrel is connected

and not the liquid chlorine supply 

if no evaporator

 is

used.
The barrels are marked with a stripe which must be
horizontal when the barrel is positioned in the support.
The upper connection is always used for chlorine gas,
the lower connection delivers liquid chlorine for evaporator
operation.

Use always new sealings for the connection of lines and
fittings. The flexible copper lines must be cut off
rectangularly at both ends and inserted very carefully into
the screwings with cutting ring.

The threaded coupling is held tight with one  fork wrench,
another one is used to fasten the union nut of the screwed
union. If only one barrel is used the line is connected
directly to the inlet valve of the chlorinator as described
before.
The line must always go 

upward

.

Operating and Maintenance Instructions

Colored stripe

Cut rectangularly and
push 5 mm of the pipe
through the cutting ring

Pipe must never be out
of true at the cutting ring

right

wrong

Slightly move the line during fastening

Right installation

*The liquid separator is not required if the connected
lines are dimensioned so that they can carry approx.
150 cm

3

 of liquid chlorine without entering the chlorinator.

Twist the flexible lines like a rising coil. Thus liquid
chlorine can flow back to the barrel. If several barrels are
connected, these are linked together first by means of a
manifold (3). A main shutoff valve (4) is mounted on the
output. A steel or copper pipe connects this valve to the
inlet valve of the chlorinator. For automatic cutoff of the
chlorine gas in the case of an alarm, a solenoid valve (6)
can be installed which is controlled by the gas warning
device (25). All lines and fittings in contact with chlorine
gas must be sealed with DIACRYLAT liquid plastic.
Never use organic substances such as hemp!
If the chlorine gas is highly contaminated, we recommend
to integrate a commercial chlorine gas filter (9) in the line.
For a continuous operation, it is appropriate to install an
automatic chlorine barrel changeover device (5). It is
mounted between two barrel batteries and, in connection
with a chlorine gas contact vacuum gauge (7), ensures
uninterrupted metering. A switch box supplied with the
changeover device indicates the battery currently
connected by means of LEDs. Chlorine barrels and
chlorinators must be protected against direct sunlight
and heating by radiators. The temperature along the gas
line must never be lower than the cylinder temperature,
because recondensation of chlorine gas severely
damages the chlorinator. If chlorine recondensation is
possible, a chlorine reducing valve (8) must be installed
as close as possible to the chlorine barrels or after the
changeover valve (5).
To avoid recondensation, make sure that the temperature
of the room heating is 

not

 reduced at night because the

chlorine gas lines cool off much faster than the barrels.
Cool nights after warm summer days might have the
same effect.

Wrong installation

Possible
chlorine agglomeration

Upper connection for
chlorine gas

Lower connection for
liquid chlorine

Lay flexible copper lines
upward as shown

Liquid
separator

*

Lutz-Jesco GmbH

Improved changes are always reserved without notice.

Содержание C 2700

Страница 1: ...ach room is to be provided with small ventilation openings in the floor and ceiling These openings must directly lead outside and their cross sections should not exceed 40 cm2 In the case of unfavoura...

Страница 2: ...r first by means of a manifold 3 A main shutoff valve 4 is mounted on the output A steel or copper pipe connects this valve to the inlet valve of the chlorinator For automatic cutoff of the chlorine g...

Страница 3: ...en with nuts d by turns so that the receiving blocks are parallel to each other The prepared measuring set is fixed to the base plate Now tighten the spacer bolts c gently by turns Fasten the flanges...

Страница 4: ...alves If the barrel connecting valve 2 leaks the gland stud must be retightened by about a quarter turn For this purpose the handwheel of the valve must be removed This can be done under gas pressure...

Страница 5: ...by an authorized specialist firm at least once a year Preferably this should happen at the beginning of a high rate period prior to a downtime or a restart General The vacuum systems described need l...

Страница 6: ...ector MB 2 31 02 15 Non return valve 16 Shutoff valve with solution injection MB 2 34 01 Legend 17 Safety blowoff line 18 Filter 19 Shutoff valve MB 2 29 04 20 Booster pump MB 2 29 01 21 Control cabin...

Страница 7: ...losses due to friction in pipes wrong gluing or fittings Check joints Float stuck in flow meter glass Clean flow meter as described under Maintenance Components under vacuum prime Check the joints of...

Отзывы: