below the chlorinator (10) into a water tank. Open shutoff
valve (16) and motive water line. The chlorinator is then
under vacuum. When the gas line is closed, a column of
water is primed according to the displacement volume of
the diaphragms and can be seen in the transparent
tubing.
If the device is absolutely tight, the column of water will
have a constant level. If there is a leak, the water will
continue to rise. Interrupt the test, 

before

 water enters

the chlorinator. See troubleshooting table.

Safety Valve

The safety valve installed in the center chamber of the
chlorinator is closed if the chlorine gas inlet valve is
operable. If it leaks due to contamination or wear, an
excessive pressure is produced in the lower chamber.
The safety valve opens at an excessive pressure of
approx. 0.5 bar and, via the vent line, carries the chlorine
gas outside or to the installed warning device. Check this
line using a small amount of ammonia solution (liquid
ammonia) when starting up the installation.

Replacing the Measuring Glass

For replacement, remove the measuring glass (k) together
with the receiving blocks (b). The spacer bolts (c) can be
dismounted after screwing off the cap nuts (d). After
loosening the screws (h), the receiving blocks (b) can be
removed. For assembly, proceed as follows:
Prepare both receiving blocks (b) by positioning the
flange bushing (e) in the recess of the receiving block and
by covering it with the rubber ring (f). Then the flange (g)
(still without measuring glass) is fastened manually with
screws (h). The measuring glass (k) is prepared by
inserting the float (i) with the point showing downward
and the fitting edges (l) into the measuring glas ends.
Then the preassembled blocks are slid onto the measuring
glass ends. Insert the spacer bolts (c) and fasten with
nuts (d) by turns so that the receiving blocks are parallel
to each other. The prepared measuring set is fixed to the
base plate. Now tighten the spacer bolts (c) gently by
turns. Fasten the flanges (g) with the screws (h) and
connect the lines.

Chlorinators

The chlorinators are installed perpendicularly, because
the measuring glass must be vertical for accurate
indication. The motive water and solution lines have to be
connected to the injection nozzles, in accordance with
the ejector nominal widths and free of tension. In the case
of long solution lines, the pressure loss must be considered
as back pressure of the ejector.

Sprinkler System

All rooms storing chlorine should have a sprinkler system
(24), which cleans the air if chlorine gas escapes. The
system can be switched on outside the room by means
of a hand valve (23) with an extended spindle or by a
solenoid valve (22) controlled by the gas warning device
(25).

Tests Before Startup And For Maintenance
Purposes

Motive Water And Solution Line

If the existing motive water pressure is lower than 10 bar,
the shutoff valve (16) can be closed for the pressure test.
Open the motive water valve slowly and check for leaks.
Fasten the screwed PVC joints manually. Leaking
cemented connections must be renewed with balanced
lines. At motive water pressures of more than 10 bar, the
shutoff valve (16) must always be open in order to protect
the ejector. The system pressure prevailing at the injection
nozzle becomes effective.

Ejector Non-Return Valve

For pressure test, close shutoff valve (injection nozzle)
and open motive water line slowly. Disconnect suction
tubing at the joint of the non-return valve (13). The valve
must not leak. If it is leaking, dismount the valve and
eliminate the error.

Vacuum LeakageTest of the Chlorinator

Plunge the end of more than 3 m of transparent PE vent
line (17) coming from the center chamber approx. 1.5 m

approx. 1.5 m

vertical height

transparent
tubing (3 m)

Water

k
i

g

f

b

h

l

c

e

d

Lutz-Jesco GmbH

Improved changes are always reserved without notice.

Содержание C 2700

Страница 1: ...ach room is to be provided with small ventilation openings in the floor and ceiling These openings must directly lead outside and their cross sections should not exceed 40 cm2 In the case of unfavoura...

Страница 2: ...r first by means of a manifold 3 A main shutoff valve 4 is mounted on the output A steel or copper pipe connects this valve to the inlet valve of the chlorinator For automatic cutoff of the chlorine g...

Страница 3: ...en with nuts d by turns so that the receiving blocks are parallel to each other The prepared measuring set is fixed to the base plate Now tighten the spacer bolts c gently by turns Fasten the flanges...

Страница 4: ...alves If the barrel connecting valve 2 leaks the gland stud must be retightened by about a quarter turn For this purpose the handwheel of the valve must be removed This can be done under gas pressure...

Страница 5: ...by an authorized specialist firm at least once a year Preferably this should happen at the beginning of a high rate period prior to a downtime or a restart General The vacuum systems described need l...

Страница 6: ...ector MB 2 31 02 15 Non return valve 16 Shutoff valve with solution injection MB 2 34 01 Legend 17 Safety blowoff line 18 Filter 19 Shutoff valve MB 2 29 04 20 Booster pump MB 2 29 01 21 Control cabin...

Страница 7: ...losses due to friction in pipes wrong gluing or fittings Check joints Float stuck in flow meter glass Clean flow meter as described under Maintenance Components under vacuum prime Check the joints of...

Отзывы: