7
17.
Carefully insert the trigger into
the gearbox. Trigger spring has to be
outside the gearbox.
16.
Carefully plug top board into the
bottom. Watch for right jumpers position
otherwise Leviathan could be damaged.
18.
Push the trigger spring into the
gearbox by screwdriver or pliers.
19.
Lube the top part of the trigger by
small amount of vaseline (for RFTS).
20.
Check sector gear height, it can‘t
touch the optical sensor or screw.
21.
Insert the remaining parts into
the gearbox. Put together the gearbox
shell. Check if it fits perfectly together.
Содержание LEVIATHAN NGRS
Страница 1: ...INSTALLATION MANUAL FOR TOKYO MARUI NGRS ...