An optional inner stay may be fi tted.
Four solutions are suggested:
- A fi xed stay fi xe with roller furler.
- A cable releasable stay (adjustment by turnbuckle).
- A textile releasable stay (adjustment by halyard).
- A textile stay with sail on furler.
The mainsail, genoa and fore staysail sheets, the topping lift, the reefi ng lines,
the mainsail and spinnaker halyards, the control lines for the main sheet tra-
veller are led back to the manoeuvre station.
The genoa may be optionally installed on a electric roller furler that is operated
by a switch from the starboard helm station.
In case of problem, please refer to the instructions given in the APPENDIX.
The boat may be fi tted with an optional boom with an electric adjustment of
the mainsheet.
The electronic box is located under the forward fl oorboard of the saloon.
Operate the switches located next to the starboard and port helm stations to
sheet or ease off the mainsail.
The automatic breaker of the electric engine is located on the panel under the
step giving access to the starboard aft cabin.
Be careful of the power the electric engine develops.
n
WINCHES
The boat may be fi tted with optional electric sheet and manoeuvring win-
ches.
The automatic breakers of the electric winches are on the panel under the
step giving access to the starboard aft cabin.
The 24V electric engines and their relays are accessible through the cabin
ceilings (genoas) or in the garage (spinnaker).
Recharge the batteries after sailing one day and using electric winches.
RIGGING / SAILS
3.3
FORE STAYSAIL
33
3
3.4 RUNNING RIGGING
Содержание 57
Страница 1: ...INSTRUCTION GUIDE...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 9: ...SPECIFICATIONS 1 1 I D OF YOUR BOAT 1 2 TECHNICAL SPECIFICATIONS 7 1...
Страница 10: ......
Страница 14: ......
Страница 16: ...14...
Страница 30: ......
Страница 46: ......
Страница 54: ......
Страница 66: ......
Страница 67: ...WATERSYSTEMS 6 1 BILGE PUMP SYSTEM 6 2 GREY WATERS 6 3 BLACK WATERS 6 4 FRESH WATER 6 5 WATERMAKER 65 6...
Страница 78: ......
Страница 79: ...ELECTRICITY 7 1 12V 24V CIRCUITS 7 2 INVERTERS 7 3 230V CIRCUIT 7 4 ELECTRONICS 77 7...
Страница 92: ......
Страница 102: ......
Страница 103: ...WINTERSTORAGE 9 1 LAYING UP 9 2 PROTECTION 101 9...
Страница 104: ...102...
Страница 106: ......
Страница 107: ...HANDLING 10 1 PREPARATION 10 2 CRANE LIFTING 10 3 MAST STEPPING AND REMOVAL 105 10...
Страница 108: ...106 CRANE LIFTING INSTRUCTIONS CRANE LIFTING INSTRUCTIONS 200 mm 200 mm...
Страница 110: ......
Страница 112: ...110...
Страница 120: ...118...
Страница 122: ......
Страница 123: ...MAINTENANCE 12 1 MAINTENANCE SCHEDULE 121 12...
Страница 126: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......