The JEANNEAU 57 exists in three accommodation versions; some of them are
convertible.
n
REMOVING THE BULCKHEAD
For the versions where the forward cabins can be transformed, proceed as
follows (please refer to the fi gures on the opposite page):
- In the starboard forward cabin, unbolt the upper bulkhead panel that is the
most in front (fi gure 1).
- Lift the panel then free it (fi gures 2 and 3).
- Remove the upper wedge (fi gure 4).
- Lightly pull the following panel then lift it (fi gure 5).
Proceed the same way for the remaining panels.
- Remove the central holding part (fi gure 6).
- Lift the lower front panel then free it (fi gure 7).
Proceed the same way for the remaining panels.
n
PUTTING BACK THE BULKHEAD
To put back the central bulkhead, follow the same procedure as the one you
follow when you remove it but in reverse order.
n
STORAGE OF THE BULKHEAD PANELS
The storage of the different elements of the central bulkhead is provided for
in the locker under the starboard berth.
An insert is provided for at the end of the locker to put the end of the central
holding part.
n
CONVERTIBLE BERTHS
On these same versions, the berths in the forward cabins are convertible de-
pending on your needs.
In the port forward cabin, it is possible to transform the back of the settee into
a bunk bed (Held by a sling fastened onto the ceiling chainplate).
In the starboard forward cabin, it is possible to get a larger bed, lifting the fl ap
until it blocks in high position.
Simultaneously lift the three levers under the fl ap to fold it.
In both cabins, it is advisable to put the additional infi ll cushion on the remo-
vable part.
ACCOMMODATIONS
4.1
CONVERTIBLE FORWARD CABINS
47
4
Содержание 57
Страница 1: ...INSTRUCTION GUIDE...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 9: ...SPECIFICATIONS 1 1 I D OF YOUR BOAT 1 2 TECHNICAL SPECIFICATIONS 7 1...
Страница 10: ......
Страница 14: ......
Страница 16: ...14...
Страница 30: ......
Страница 46: ......
Страница 54: ......
Страница 66: ......
Страница 67: ...WATERSYSTEMS 6 1 BILGE PUMP SYSTEM 6 2 GREY WATERS 6 3 BLACK WATERS 6 4 FRESH WATER 6 5 WATERMAKER 65 6...
Страница 78: ......
Страница 79: ...ELECTRICITY 7 1 12V 24V CIRCUITS 7 2 INVERTERS 7 3 230V CIRCUIT 7 4 ELECTRONICS 77 7...
Страница 92: ......
Страница 102: ......
Страница 103: ...WINTERSTORAGE 9 1 LAYING UP 9 2 PROTECTION 101 9...
Страница 104: ...102...
Страница 106: ......
Страница 107: ...HANDLING 10 1 PREPARATION 10 2 CRANE LIFTING 10 3 MAST STEPPING AND REMOVAL 105 10...
Страница 108: ...106 CRANE LIFTING INSTRUCTIONS CRANE LIFTING INSTRUCTIONS 200 mm 200 mm...
Страница 110: ......
Страница 112: ...110...
Страница 120: ...118...
Страница 122: ......
Страница 123: ...MAINTENANCE 12 1 MAINTENANCE SCHEDULE 121 12...
Страница 126: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......