n
SAIL SETTING
STANDARD MAINSAIL
When the mainsail is on the deck:
- Screw the pins of the mast sliders into their boxes.
- Put in the battens starting from the leech.
- Screw the cap of the box till you get the desired tension (the tension screw
shall not stick out of the sail).
Mind you do not forget the locking screw.
- Put the mainsail in the lazy-bag.
- Set the mainsail onto its slides, begin with the head board and fi nish with
the tack.
ROLLER FURLING MAINSAIL
- Remove the hatch giving access to the furling gear.
- Spread the sail on the deck.
- Fasten the head (Strap) onto the shackle of the upper swivel. Pay attention
to the furling direction.
- Reeve the leech adjustment pennant through the clew block.
- Hoist the sail.
Guide the bolt rope (Sometimes the groove is not polished enough at its be-
ginning).
- When the sail is hoisted, board the main tack to the lower shackle.
- Sway up but do not force.
- Put the access hatch back.
- Furl the sail head to wind, keeping a very slight tension on the foot.
The boom vang and mainsheet shall be eased off.
ROLLER FURLING GENOA
Hoist the genoa before you get under way, taking advantage of a windless
period of time.
- Secure the head.
- Secure the halyard to the slide-swivel.
- Secure the tack to the drum and secure the sheets.
- Insert carefully the bolt rope into the hole, hoist the sail and take care you
do not tear it.
- Haul the halyard taut enough but sway it up less than a sail on a standard
stay.
- Hoist it until the horizontal creases disappear (the tension of the luff shall be
adjusted after a few sea trips).
- Pull on the line from the cockpit to furl the genoa.
RIGGING / SAILS
3.5
SAILS
35
3
Содержание 57
Страница 1: ...INSTRUCTION GUIDE...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 9: ...SPECIFICATIONS 1 1 I D OF YOUR BOAT 1 2 TECHNICAL SPECIFICATIONS 7 1...
Страница 10: ......
Страница 14: ......
Страница 16: ...14...
Страница 30: ......
Страница 46: ......
Страница 54: ......
Страница 66: ......
Страница 67: ...WATERSYSTEMS 6 1 BILGE PUMP SYSTEM 6 2 GREY WATERS 6 3 BLACK WATERS 6 4 FRESH WATER 6 5 WATERMAKER 65 6...
Страница 78: ......
Страница 79: ...ELECTRICITY 7 1 12V 24V CIRCUITS 7 2 INVERTERS 7 3 230V CIRCUIT 7 4 ELECTRONICS 77 7...
Страница 92: ......
Страница 102: ......
Страница 103: ...WINTERSTORAGE 9 1 LAYING UP 9 2 PROTECTION 101 9...
Страница 104: ...102...
Страница 106: ......
Страница 107: ...HANDLING 10 1 PREPARATION 10 2 CRANE LIFTING 10 3 MAST STEPPING AND REMOVAL 105 10...
Страница 108: ...106 CRANE LIFTING INSTRUCTIONS CRANE LIFTING INSTRUCTIONS 200 mm 200 mm...
Страница 110: ......
Страница 112: ...110...
Страница 120: ...118...
Страница 122: ......
Страница 123: ...MAINTENANCE 12 1 MAINTENANCE SCHEDULE 121 12...
Страница 126: ......
Страница 128: ......
Страница 129: ......
Страница 130: ......